Inspections for the day of: Friday, February 12, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM15-04303 Other2/12/20162/12/20162/12/2016 5:16:28 PMPNR
will need to retest the dental gas system after valve boxs are changed out for the building inspector.
PLM16-00470 Plumbing Rough-in2/12/20162/12/20162/12/2016 5:02:30 PMPFAIL
Phone #: ###-#### Inspection requested via web by robert goodson
1) I passed the water, waste and rain water system tests
2) provide a plumbing plan showing the type and locations of the fixtures installed
MEC16-00645 Final2/12/20162/12/20162/12/2016 4:58:11 PMPPASS
INSTALLER DAVID ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
PLM16-00471 Water Heater Final2/12/20162/12/20162/12/2016 3:17:56 PMPNH
no access left notice
PLM16-00471 Water and/or Sewer2/12/20162/12/20162/12/2016 3:17:11 PMPCANC
Phone #: ###-#### Inspection requested via web by Erin Whiting this was a water heater final
PLM15-04340 Water Heater Final2/12/20162/12/20162/12/2016 3:05:28 PMPFAIL
Phone #: ###-#### Inspection requested via web by Erin Whiting
1) remove trap in t&p line
2) remove water heater flex in t&p line
PLM15-04172 Water and/or Sewer2/12/20162/12/20162/12/2016 2:54:27 PMPPASS
Will be ready after noon. Phone #: ###-#### Inspection requested via web by James Paulin sw to shop ok to cover
PLM16-00454 Water and/or Sewer2/11/20162/12/20162/12/2016 2:31:33 PMPPART
Please call Brian when on the way ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Jennifer Alcala everything ok but the lawn sprinkler connection and test
MEC16-00643 Rough-in2/11/20162/12/20162/12/2016 1:45:36 PMPCANC
Phone #: ###-#### Inspection requested via web by Shelia Gibson Troy and Chad are both off today, talked to Jerry and he said it could wait till Tuesday, I set up an inspection for Tuesday am with Troy
MEC15-05765 Final2/11/20162/12/20162/12/2016 1:26:45 PMAPASS
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
MEC16-00574 Rough-in2/11/20162/12/20162/12/2016 11:15:45 AMAFAIL
Chris Phone #: ###-#### needs class 1 duct
MEC15-00064 Final2/11/20162/12/20162/12/2016 9:21:31 AMAFAIL
Bob would like to have as early as possible and can you please call him when you are heading his way. Thanks!! Phone #: ###-#### Inspection requested via web by Brenda St Clair
1) test flue
2) combustion air piping came apart
3) hang combustion air and flue piping with approved material
4) needs co alarms
MEC15-00479 Mec-Aging Inspection2/12/20162/12/20162/12/2016 8:31:37 AM PEND
talked to contractor they will schedule a final
MEC16-00347 Final2/11/20162/12/20162/12/2016 8:26:53 AMAPASS
Please schedule pressure test to final inspection first thing tomorrow morning. Phone #: ###-#### Inspection requested via web by James Staley