MEC16-00634
| Pressure Test | 2/12/2016 | 2/12/2016 | 2/12/2016 4:27:43 PM | P | PASS |
|
|
Ben Phone #: ###-####- 20lb gas
|
MEC16-00633
| Pressure Test | 2/12/2016 | 2/12/2016 | 2/12/2016 4:12:10 PM | P | PASS |
|
|
Ben Phone #: ###-####- 20lb gas
|
MEC16-00649
| Final | 2/12/2016 | 2/12/2016 | 2/12/2016 4:02:19 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Xanti Berria
|
MEC15-04613
| Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 3:06:05 PM | P | PASS |
|
|
We are requesting a very late PM inspection if possible/ ###-####/Mike Phone #: ###-#### Inspection requested via web by Crystal Grant- phase2 and 3 ok to ins. duct
|
MEC16-00652
| Final | 2/12/2016 | 2/12/2016 | 2/12/2016 2:45:34 PM | P | PASS |
|
|
As late as possible please. Cody - ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC16-00652
| Pressure Test | 2/12/2016 | 2/12/2016 | 2/12/2016 2:38:07 PM | P | PASS |
|
|
Flu Pressure Test Cody - ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich-5lb flue
|
MEC16-00388
| Final | 2/11/2016 | 2/12/2016 | 2/12/2016 2:22:25 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Wickstrom
|
MEC15-05590
| Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 1:50:00 PM | P | PASS |
|
|
gas and flues please call Daniel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- all remaining flues 5lb,
|
MEC15-05590
| Pressure Test | 2/11/2016 | 2/12/2016 | 2/12/2016 1:48:43 PM | P | PASS |
|
|
gas and flues please call Daniel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss-203,205,207, 103,105,107 20lbgas
|
MEC15-05592
| Final | 2/12/2016 | 2/12/2016 | 2/12/2016 11:36:31 AM | P | PASS |
|
|
Should be unlocked until noon for access. Phone #: ###-#### Inspection requested via web by James Staley
|
MEC16-00564
| Pressure Test | 2/11/2016 | 2/12/2016 | 2/12/2016 10:57:57 AM | A | FAIL |
|
|
Please call about 30 minutes prior to inspection. Angel DiNaro ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- still not installed correctly. look at page 45 of insallers guide.. mesh and outer jacket need to be attatched correctly
|
MEC16-00515
| Pressure Test | 2/10/2016 | 2/12/2016 | 2/12/2016 10:45:13 AM | A | FAIL |
|
|
Inspection requested via web by Don Dowers- wasnt at 20 lbs, try turning off the valve when you are at 20 lbs the guage may be at fault.
|
MEC15-04633
| Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 10:27:42 AM | A | PASS |
|
|
Please call Brad, Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- 4th floor 2nd and 3rd stack ok to ins. duct
|
MEC15-04552
| Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 10:17:15 AM | A | PASS |
|
|
hydronic 4th floor office - hydrostatic test. if questions call shane @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 4th floor 100lb main hydronic heat and chilled
|
MEC15-04633
| Rough-in | 2/12/2016 | 2/12/2016 | 2/12/2016 10:12:28 AM | P | PASS |
|
|
Call Brad, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- anax building main shaft duct ok to ins.
|
MEC16-00509
| Final | 2/11/2016 | 2/12/2016 | 2/12/2016 9:13:55 AM | A | PASS |
|
|
Please contact John @ ###-#### and give a 30 minute window so that the tenant can unlock the suite. Please contact lead technician, Luke, for any questions or concerns regarding the unit. Phone #: ###-#### Inspection requested via web by Olivia Hicks
|
MEC15-05592
| Final | 2/11/2016 | 2/12/2016 | 2/12/2016 8:39:32 AM | A | FAIL |
|
|
Please do inspection between 8am-9am Phone #: ###-#### Inspection requested via web by James Staley- corrections not made
|
MEC15-03949
| Pressure Test | 2/11/2016 | 2/12/2016 | 2/12/2016 8:26:13 AM | A | PASS |
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas main corridor 3 stub outs
|
MEC14-02068
| Mec-Aging Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 7:44:12 AM | | CANC |
|
|
|
MEC15-02949
| Mec-Aging Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 7:43:47 AM | | CANC |
|
|
|
MEC15-02982
| Mec-Aging Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 7:41:59 AM | | CANC |
|
|
|
MEC15-03158
| Final | 2/9/2016 | 2/12/2016 | 2/11/2016 1:21:06 PM | A | CANC |
|
|
Please call when heading her way. Thanks! Phone #: ###-#### Phone #: ###-#### >> Inspection requested via web by Brenda St Clair Inspection cancelled from web by: Brenda St Clair
|
MEC16-00281
| Pressure Test | 2/10/2016 | 2/12/2016 | 2/11/2016 9:22:15 AM | P | CANC |
|
|
Please call Daryl with any questions. Phone #: ###-#### >> Inspection requested via web by Diane Day Inspection cancelled from web by: Diane Day
|
MEC16-00281
| Rough-in | 2/10/2016 | 2/12/2016 | 2/11/2016 9:22:14 AM | P | CANC |
|
|
Please call Daryl with any questions. Phone #: ###-#### >> Inspection requested via web by Diane Day Inspection cancelled from web by: Diane Day
|