FIR15-00687
| INSP-Sprinkler Rough-in | 2/12/2016 | 2/12/2016 | 2/12/2016 11:34:04 AM | P | PASS |
|
|
See the city approved plans for pendant heads marked "ok" where piping can be covered in the lower ceilings in the first floor east end rooms.
|
BLD15-03816
| FIRE-Final Inspection | 2/11/2016 | 2/12/2016 | 2/12/2016 10:59:03 AM | A | PASS |
|
|
Life safety passed.
|
BLD16-00128
| FIRE-Final Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 10:09:07 AM | P | PASS |
|
|
life safety passed
|
FIR15-00517
| INSP-Sprinkler Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 9:44:32 AM | A | PASS |
|
|
24 hour air test passed
|
FIR15-00713
| INSP-Sprinkler Rough-in/Hydro | 2/11/2016 | 2/12/2016 | 2/12/2016 8:51:48 AM | A | FAIL |
|
|
Started test but the fitter found a leak at a 90.
|
FIR15-00575
| INSP-Sprinkler Rough-in | 2/12/2016 | 2/12/2016 | 2/12/2016 8:21:21 AM | A | PASS |
|
|
Overhead rough-in passed. painted heads changed out. Piping can be covered.
|
BLD15-03732
| FIRE-Final Inspection | 2/11/2016 | 2/12/2016 | 2/12/2016 8:03:43 AM | A | PASS |
|
|
Life safety passed.
|