FIR16-00068
| INSP-Sprinkler Rough-in | 2/12/2016 | 2/12/2016 | 2/12/2016 4:44:11 PM | P | PASS |
|
|
Rough-in complete satisfactory. OK to cover. On-site plans annotated.
|
FIR15-00777
| INSP-Final Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 2:04:33 PM | P | FAIL |
|
|
Inspection was not a final. It was hydro test for the underground. System dropped to 172 psi from 200 psi, failed. System to be retested.
|
BLD15-02029
| FIRE-Final Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 1:29:20 PM | P | PASS |
|
|
Fire Life safety pass
|