Inspections for the day of: Wednesday, February 12, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00947 Electrical Rough-In2/11/20202/12/20202/12/2020 2:36:33 PMPPASS
Andy Phone #: ###-#### Ok cover library hardlid and adjacent 2 areas in hallway outside library, 1 classroom up and 1 classrooms down for ceilings.
ELE17-02875 ELE-Aging Inspection2/12/20202/12/20202/12/2020 1:24:26 PM DONE
Called on 2/12 at 120 pm and left message about the need to coordinate a final inspection.
ELE19-04497 Final2/12/20202/12/20202/12/2020 1:23:46 PMPPASS
Call for garage- Jason Phone #: ###-#### Ok final.
ELE19-01407 Final2/11/20202/12/20202/12/2020 12:35:13 PMAPASS
call for location of key // Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok final.
ELE20-00197 Final2/11/20202/12/20202/12/2020 12:24:39 PMPCANC
homeowner is retired. he drops his granddaughter off at school every morning and is usually home by 1030 Phone #: ###-#### Inspection requested via web by Justin Frates Left message with contractor, and rescheduled for 2/13
ELE19-04851 Final2/12/20202/12/20202/12/2020 12:09:50 PMPPASS
Jay Phone #: ###-#### Ok final. 200a meter main that was used as sub panel, was changed out to an outdoor 100a panel. Panel labeled.
ELE19-03816 Electrical Rough-In2/12/20202/12/20202/12/2020 12:01:16 PMPPASS
Master bath floor heat inspection. Directions and specs are in vanity cabinet drawer. Thank you! Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover flr heat mstr.
ELE19-03112 Final2/11/20202/12/20202/12/2020 11:22:51 AMPPASS
SK electric Ok final
ELE19-04320 Final2/12/20202/12/20202/12/2020 11:04:46 AMAPASS
I may or may not be on site. the forman on the project named luka will be there. feel free to call me if you want. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final. 3/0 blank in closet ceiling.
ELE20-00432 Permanent Service2/12/20202/12/20202/12/2020 11:04:16 AMAPASS
p/s o/h n ok
ELE20-00472 Final2/12/20202/12/20202/12/2020 10:30:19 AMPPASS
Ok final. GFI functions properly, refer is tamper resistant
ELE20-00472 Electrical Rough-In2/11/20202/12/20202/12/2020 10:29:47 AMAPASS
Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok cover wall behind and to side of new refer location.
ELE20-00432 Final2/10/20202/12/20202/12/2020 9:58:20 AMPPASS
Please call Brodie @ ###-#### with any questions. Phone #: ###-#### Inspection requested via web by William Salts p/s o/h n ok
ELE19-03595 Final2/11/20202/12/20202/12/2020 9:42:52 AMAPASS
can this be finaled? 415-T. Y. Ok inal. Intersystem installed.
ELE19-03575 Final2/11/20202/12/20202/12/2020 9:42:10 AMAPASS
###-#### Inspection was supposed to be scheduled for 2/12 as per contractor. Ok final. 200a serviced with 2 pole 30 installed. All labels present
ELE17-03649 DOC - Permit Expired2/12/20202/12/20202/12/2020 5:25:11 AMADONE
Talked to Lee Electric, no work was done at this address. Convert garage to living space was not approved due to issues with re-routing sewer to structure.