ESC18-01432
| General Inspection | 2/12/2020 | 2/12/2020 | 2/14/2020 9:10:45 AM | | PASS |
|
|
Some landscaping still needed. DI protection installed in parking lot.
|
ESC18-01447
| General Inspection | 2/12/2020 | 2/12/2020 | 2/13/2020 12:18:00 PM | | PASS |
|
|
Work hasn't begun
|
ESC19-01598
| BMP Violation | 2/6/2020 | 2/12/2020 | 2/12/2020 2:38:54 PM | A | PASS |
|
|
Dumped washout cleaned, leakproof washout used at site. Reinspection fee still needs to be paid.
|
ESC18-01160
| Aging Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 2:31:47 PM | | CANC |
|
|
|
ESC18-01160
| DOC - Permit Finaled | 2/12/2020 | 2/12/2020 | 2/12/2020 2:31:40 PM | P | PASS |
|
|
|
ESC19-00241
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 2:30:52 PM | | PART |
|
|
Hauling in backfill and grading. Some trackout, taled to foreman. Will broom the next few days and have a sweeper end of week.
|
ESC19-00311
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 2:00:28 PM | | CANC |
|
|
|
ESC19-00311
| DOC - Permit Finaled | 2/12/2020 | 2/12/2020 | 2/12/2020 2:00:22 PM | P | PASS |
|
|
|
ESC19-00206
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 12:36:19 PM | | DEFR |
|
|
|
ESC20-00033
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 12:36:02 PM | P | PASS |
|
|
Foundation done. Waiting on pressure test to fill back in backfill.
|
ESC19-00016
| Site Final | 2/12/2020 | 2/12/2020 | 2/12/2020 12:26:10 PM | P | PASS |
|
|
|
ESC18-01411
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 12:18:45 PM | | PASS |
|
|
Clean and contained, nothing blowing off site and no tracking.
|
ESC19-00542
| Tracking Control | 2/10/2020 | 2/12/2020 | 2/12/2020 12:18:08 PM | A | PASS |
|
|
Talked with RP, she requested crushed basalt and they brought in round rock. She is there weekly and will monitor.
|
ESC19-01555
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 11:41:40 AM | P | PART |
|
|
Nontrenched silt fence along north perimeter. Crushed entrance installed, has wattle at end and gravel snake bags on road. Large excavated pile from what looks like test pit or seepage. If idle stockpile will need to be covered. Small section of site excavated a few feet below grade.
|
ESC20-00055
| Tracking Control | 2/11/2020 | 2/12/2020 | 2/12/2020 11:24:25 AM | P | FAIL |
|
|
Tracking onto Cloverdale. Irrigation ditch has been blocked. Message and picture sent to RP, foll up scheduled for 2-14
|
ESC19-00773
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 10:51:13 AM | P | PASS |
|
|
WIP, no tracking to state. Front is bare.
|
ESC19-01282
| Site Final | 2/12/2020 | 2/12/2020 | 2/12/2020 10:40:34 AM | P | PASS |
|
|
|
ESC18-01227
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 10:40:16 AM | P | PART |
|
|
Lots of dirt within site, none tracking out. Any damage will be to onsite seepage and retention. Two large dumpsters, some loose lumber scraps.
|
ESC19-00961
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 10:39:20 AM | P | PASS |
|
|
WIP on multiple units within area.
|
ESC19-00832
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 10:05:40 AM | P | PASS |
|
|
Outside work of home and shop look completed. Lot is bare and muddy, candles are up to try to direct workers and prevent them from going into mud.
|
ESC19-00884
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 9:48:53 AM | P | PASS |
|
|
Work area is below grade. Staging and washout is located across street. Road is swept, some dirt on aprons. No loose trash.
|
ESC19-01584
| General Inspection | 2/10/2020 | 2/12/2020 | 2/12/2020 9:31:00 AM | P | PASS |
|
|
Well point in place, not currently pumping. No standing water or issues from yesterdays dewatering. Will continue to monitor until sewer is completed. Sewer inspector keeps us informed if issues arise.
|
ESC19-00672
| General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 9:18:26 AM | P | PASS |
|
|
Sitye is contained. Fence is up so workers can't drive through lot. Rock has been brought in for stabilization. No tracking.
|