MEC96-03585
| INSP - Final | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | PASS |
|
|
02/13/97 350 - final
|
MEC96-03585
| INSP - Final | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | PASS |
|
|
02/13/97 350 - final
|
MEC96-03914
| INSP - Final | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | FAIL |
|
|
02/13/97 350 - no final corrections
|
MEC96-03914
| INSP - Final | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | FAIL |
|
|
02/13/97 350 - no final corrections
|
MEC97-00012
| INSP - Retro Fit (check note) | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | FAIL |
|
|
02/13/97 350 - AFTER 9:00..GAS LINE WITNESSED BY INT GAS..FURNACE no r/i corrections on comb.-air and fresh-air to furn. and protect b-ven upstairs closet
|
MEC97-00243
| INSP - Gas pressure test | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | PASS |
|
|
02/13/97 350 - pt ok
|
MEC97-00387
| INSP - Rough-in & Gas Pressure | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | PASS |
|
|
02/13/97 350 - final
|
BLD96-02329
| INSP - Framing/Rough-in | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | PART |
|
|
02/13/97 350 - corrections on frame, posted on front window ok to insula
|
BLD96-03247
| INSP - Framing/Rough-in | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | PASS |
|
|
02/13/97 350 - SUITE 2-C framed wall around enlarged bathroom ok
|
BLD96-02507
| INSP - Final | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | A | FAIL |
|
|
02/13/97 350 - no final, corrections, also permit calls for unfinishe ro sheetrocked and taped, told them to update permit.
|
BLD96-02616
| INSP - Framing/Rough-in | 2/13/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | PART |
|
|
02/13/97 350 - garage remodel ok to insulate, have a question on attachm plates, they are getting detail from engineer.
|
BLD97-00021
| INSP - Framing/Rough-in | 2/11/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | PASS |
|
|
02/13/97 350 - frame ok, check trusses s2 and s2a for plates that were m points on front wall at e.c. inspection
|
BLD97-00211
| INSP - Footings | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | PASS |
|
|
02/13/97 350 - ftns. ok, setbacks ok
|
BLD97-00284
| INSP - Conference | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | PASS |
|
|
ABOUT ROOF TRUSSES ETC.
|
BLD96-02401
| INSP - Framing/Rough-in | 2/12/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | NR |
|
|
02/13/97 350 - mech. not approved for cover yet.
|
MEC96-03434
| INSP - Final | 2/13/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | CANC |
|
|
02/13/97 350 - to be done by #337
|
MEC96-03434
| INSP - Final | 2/13/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | CANC |
|
|
02/13/97 350 - to be done by #337
|
MEC97-00353
| INSP - Final | 2/13/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | PASS |
|
|
02/13/97 350 - final
|
MEC97-00353
| INSP - Final | 2/13/1997 | 2/13/1997 | 2/13/1997 12:00:00 AM | P | PASS |
|
|
02/13/97 350 - final
|