Inspections for the day of: Tuesday, February 13, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00198 BLD-Footing2/12/20012/13/20012/13/2001 12:00:00 AMAPART
Dan ###-#### ft ok. 2/12/2001 3:16:56 PM
BLD01-00198 BLD-Footing2/12/20012/13/20012/13/2001 12:00:00 AMAPART
Dan ###-#### ft ok. 2/12/2001 3:16:56 PM
BLD99-00821 BLD-Foundation2/12/20012/13/20012/13/2001 12:00:00 AMAPASS
###-#### Kelly G. slab ok 2/13/2001 11:05:42 AM
BLD00-03531 BLD-Framing/Rough-in2/12/20012/13/20012/13/2001 12:00:00 AMAPART
###-#### ok to cover all but tunnel corridor mest be reframed/need sheer wall engineering for ele boxes over cut sheathing 1 sq/ft all box penatrations. 2/13/2001 2:01:57 PM
BLD00-03531 BLD-Framing/Rough-in2/12/20012/13/20012/13/2001 12:00:00 AMAPART
###-#### ok to cover all but tunnel corridor mest be reframed/need sheer wall engineering for ele boxes over cut sheathing 1 sq/ft all box penatrations. 2/13/2001 2:01:57 PM
BLD01-00198 BLD-Foundation2/13/20012/13/20012/13/2001 12:00:00 AMPPASS
###-#### WANTS TO POUR AFTER LUNCH
BLD00-02437 BLD-Framing/Rough-in2/13/20012/13/20012/13/2001 12:00:00 AMPPASS
Stan Wiggins ###-####
BLD00-01563 BLD-Concrete2/12/20012/13/20012/13/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:40. Contact: ###-####. placed with special insp. pending report. 2/13/2001 2:03:02 PM
BLD00-01563 BLD-Concrete2/12/20012/13/20012/13/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:40. Contact: ###-####. placed with special insp. pending report. 2/13/2001 2:03:02 PM