ELE00-04627
| Final | 2/12/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | A | PASS |
|
|
entry code 9876 enter ###-#### 2/13/2001 9:45:48 AM ok final 2/13/2001 9:46:04 AM
|
ELE00-04841
| Final | 2/12/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 18:30:07. Contact: ###-####. ok final 2/13/2001 10:00:28 AM
|
ELE01-00323
| Final | 2/13/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 412 On 2/13/2001 10:02:43 AM p/s u/g n ok street lighting gave bill colson inspection by hand
|
ELE01-00436
| Rough-In Permanent Service | 2/12/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | A | PASS |
|
|
###-#### p/s u/g n ok- ok cover ri 2/13/2001 10:12:00 AM
|
ELE00-04603
| Final | 2/12/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 15:47:01. Contact: ###-####. no ceiling inspection, no service inspection correction nec110-3(b) service is not r.t. nema 3 they have 24hrs to fix water leak or replace service gear with nema 3 C.O.W. they to call for other inspections as they are ready 2/13/2001 3:25:22 PM
|
ELE01-00447
| Rough-In Permanent Service | 2/12/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | P | PASS |
|
|
###-#### p/s u/g n ok - ok cover ri 2/13/2001 3:48:42 PM
|
ELE01-00341
| Final | 2/13/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | P | PASS |
|
|
###-#### ok final 2/13/2001 3:20:43 PM
|
ELE01-00428
| Rough-In Permanent Service | 2/13/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 10:53:04. Contact: ###-####. service not ready -- ok cover ri 2/13/2001 4:17:20 PM
|
ELE00-04034
| Electrical Rough-In | 2/13/2001 | 2/13/2001 | 2/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 412 On 2/13/2001 5:35:02 PM checked on third part testing on control panls
|