MEC02-00406
| Rough-in | 2/12/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 14:15:17. Contact: ###-####.
|
MEC02-00297
| Rough-in | 2/12/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 16:15:11. Contact: ###-####. need 1/4" mesh screen over fresh air 2/13/2002 1:48:25 PM
|
MEC02-00297
| Pressure Test | 2/12/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 16:15:18. Contact: ###-####. leak 2/13/2002 1:48:31 PM
|
MEC02-00247
| Pressure Test | 2/12/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 17:12:53. Contact: ###-####. wrong size guage 2/13/2002 1:38:36 PM
|
MEC02-00252
| Rough-in | 2/13/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 07:08:26. Contact: ###-####.
|
MEC02-00178
| Final | 2/13/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | P | NR |
|
|
###-#### dave...vinyl over sheetrock 2/13/2002 3:19:02 PM
|
MEC01-03778
| Final | 2/13/2002 | 2/13/2002 | 2/13/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 09:48:57. Contact: ###-####. gas pipe not ready 2/13/2002 5:15:38 PM
|