Inspections for the day of: Thursday, February 13, 2003.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-00358 Pressure Test2/9/20042/10/2003 P 
###-####--steve
BLD02-02387 BLD-Footing2/13/20032/13/20032/13/2003 11:01:03 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Inspection cancelled from web by: Marsha Smylie
BLD02-02634 BLD-Framing/Rough-in2/12/20032/13/20032/13/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/12/2003 at 21:38:10. Contact: ###-####. shear ok to cover ext 2/13/2003 9:31:42 AM
BLD02-02687 BLD-Footing2/12/20032/13/20032/13/2003 12:00:00 AMAPART
TIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie` 2/12/2003 1:20:14 PM crew is is going to pour ftgs on the north and south sides will uae M.T.I. for spec insp pbl works schedu;led for this after noon to go over run off water 2/13/2003 9:21:36 AM
BLD02-02966 BLD-Foundation2/12/20032/13/20032/13/2003 12:00:00 AMACANC
###-####
BLD02-02174 BLD-Conference2/12/20032/13/20032/13/2003 12:00:00 AMADONE
###-#### wanted to now if they could get temps on units talked with tony should be ok as long as all other trades sign off 2/13/2003 10:16:20 AM
MEC03-00340 Pressure Test2/12/20032/13/20032/13/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/12/2003 at 16:17:41. Contact: ###-####.
BLD03-00031 BLD-Framing/Rough-in2/12/20032/13/20032/13/2003 12:00:00 AMAPASS
###-####
BLD02-00090 BLD-Framing/Rough-in2/12/20032/13/20032/13/2003 12:00:00 AMPPART
BLD02-02083 BLD-Framing/Rough-in2/13/20032/13/20032/13/2003 12:00:00 AMPPASS
###-#### keith ok to insulate 2/13/2003 5:17:12 PM
BLD02-03034 BLD-Final2/13/20032/13/20032/13/2003 12:00:00 AMPNH
###-####