MEC04-00358
| Pressure Test | 2/9/2004 | 2/10/2003 | | P | |
|
|
###-####--steve
|
BLD02-02387
| BLD-Footing | 2/13/2003 | 2/13/2003 | 2/13/2003 11:01:03 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Inspection cancelled from web by: Marsha Smylie
|
BLD02-02634
| BLD-Framing/Rough-in | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/12/2003 at 21:38:10. Contact: ###-####. shear ok to cover ext 2/13/2003 9:31:42 AM
|
BLD02-02687
| BLD-Footing | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | A | PART |
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie` 2/12/2003 1:20:14 PM crew is is going to pour ftgs on the north and south sides will uae M.T.I. for spec insp pbl works schedu;led for this after noon to go over run off water 2/13/2003 9:21:36 AM
|
BLD02-02966
| BLD-Foundation | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD02-02174
| BLD-Conference | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | A | DONE |
|
|
###-#### wanted to now if they could get temps on units talked with tony should be ok as long as all other trades sign off 2/13/2003 10:16:20 AM
|
MEC03-00340
| Pressure Test | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/12/2003 at 16:17:41. Contact: ###-####.
|
BLD03-00031
| BLD-Framing/Rough-in | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-00090
| BLD-Framing/Rough-in | 2/12/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | P | PART |
|
|
|
BLD02-02083
| BLD-Framing/Rough-in | 2/13/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | P | PASS |
|
|
###-#### keith ok to insulate 2/13/2003 5:17:12 PM
|
BLD02-03034
| BLD-Final | 2/13/2003 | 2/13/2003 | 2/13/2003 12:00:00 AM | P | NH |
|
|
###-####
|