Inspections for the day of: Friday, February 13, 2004.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00317 INSP-Conference2/12/20042/13/20042/13/2004 12:00:00 AMADONE
conference was for a door in the three hour wall between the new and the existing jail. Tom and I told Lee, who is the superintendant, that he could reuse the door frame as long as a certified company would relist the door frame 2/13/2004 10:12:53 AM
FIR03-00715 INSP-Final Inspection2/12/20042/13/20042/13/2004 12:00:00 AMAPASS
Dan ###-####
FIR03-00448 INSP-Sprinkler Rough-in/Hydro2/12/20042/13/20042/13/2004 12:00:00 AMAPART
1st and 2nd floor hydro test passed 2/13/2004 4:13:22 PM
BLD02-02452 FIRE-Final Inspection2/13/20042/13/20042/13/2004 12:00:00 AMPFAIL
tor - ###-#### The door hardware is still not correct. I discussed door hardware with Charlotte 2/13/2004 4:15:06 PM
BLD03-00602 FIRE-Sprinkler Rough-in2/12/20042/13/20042/13/2004 12:00:00 AMPFAIL
sprinkler insulation in floor does not provide less than 6" space in the combustible cavity. Additional insulation will be required 2/13/2004 4:14:16 PM