FIR03-00317
| INSP-Conference | 2/12/2004 | 2/13/2004 | 2/13/2004 12:00:00 AM | A | DONE |
|
|
conference was for a door in the three hour wall between the new and the existing jail. Tom and I told Lee, who is the superintendant, that he could reuse the door frame as long as a certified company would relist the door frame 2/13/2004 10:12:53 AM
|
FIR03-00715
| INSP-Final Inspection | 2/12/2004 | 2/13/2004 | 2/13/2004 12:00:00 AM | A | PASS |
|
|
Dan ###-####
|
FIR03-00448
| INSP-Sprinkler Rough-in/Hydro | 2/12/2004 | 2/13/2004 | 2/13/2004 12:00:00 AM | A | PART |
|
|
1st and 2nd floor hydro test passed 2/13/2004 4:13:22 PM
|
BLD02-02452
| FIRE-Final Inspection | 2/13/2004 | 2/13/2004 | 2/13/2004 12:00:00 AM | P | FAIL |
|
|
tor - ###-#### The door hardware is still not correct. I discussed door hardware with Charlotte 2/13/2004 4:15:06 PM
|
BLD03-00602
| FIRE-Sprinkler Rough-in | 2/12/2004 | 2/13/2004 | 2/13/2004 12:00:00 AM | P | FAIL |
|
|
sprinkler insulation in floor does not provide less than 6" space in the combustible cavity. Additional insulation will be required 2/13/2004 4:14:16 PM
|