ELE06-02976
| ELE-Request for Extension | 2/5/2007 | 2/6/2006 | | A | |
|
|
pls extend
|
ELE06-00508
| Final | 2/13/2006 | 2/13/2006 | 2/13/2006 4:28:14 PM | P | PASS |
|
|
installed circuit for microwave call Chris @ ###-#### to set time. Internet Inspection Request from: Andy Rose called contr to label panel. ok to final
|
ELE05-04244
| Final | 2/13/2006 | 2/13/2006 | 2/13/2006 3:47:55 PM | P | PASS |
|
|
Please final Al's Car Care pylon Internet Inspection Request from: Radon Elaina ok to final
|
ELE05-04549
| Final | 2/10/2006 | 2/13/2006 | 2/13/2006 2:47:47 PM | P | PASS |
|
|
call for garage code///nicole ###-#### or cody; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa corrections made, ok to final
|
ELE06-00456
| Electrical Rough-In | 2/13/2006 | 2/13/2006 | 2/13/2006 2:03:52 PM | P | PASS |
|
|
Eric -- for concrete and case electrode; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to backfill gec
|
ELE06-00499
| Rough-In Permanent Service | 2/10/2006 | 2/13/2006 | 2/13/2006 1:39:09 PM | P | PASS |
|
|
darrell-- ###-#### ric ok, p/s u/g n ok
|
ELE06-00471
| Final | 2/10/2006 | 2/13/2006 | 2/13/2006 12:52:01 PM | P | PASS |
|
|
We wired a new 20 amp 120 volt circuit to a new GFCI receptacle below panel. Thanks !!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell Told owner to provide work space in front of panel. ok to final
|
ELE05-02615
| ELE-Aging Inspection | 2/13/2006 | 2/13/2006 | 2/13/2006 10:25:47 AM | | DONE |
|
|
suc
|
ELE05-02446
| ELE-Aging Inspection | 2/13/2006 | 2/13/2006 | 2/13/2006 10:23:55 AM | | DONE |
|
|
see final
|
ELE06-00498
| Final | 2/10/2006 | 2/13/2006 | 2/13/2006 10:14:48 AM | A | PASS |
|
|
Call in advance; Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final
|
ELE05-02577
| ELE-Aging Inspection | 2/13/2006 | 2/13/2006 | 2/13/2006 9:59:08 AM | | DONE |
|
|
see final
|
ELE06-00427
| Final | 2/7/2006 | 2/13/2006 | 2/13/2006 9:56:57 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer called contr about reverse polarity on recpt. ok to final
|
ELE05-04418
| Final | 2/10/2006 | 2/13/2006 | 2/13/2006 9:10:28 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/10/2006 at 4:26:31 PM. Contact: ###-####. labels ok, talked with contr, ok to final
|
ELE06-00248
| Electrical Rough-In | 2/12/2006 | 2/13/2006 | 2/13/2006 8:53:47 AM | A | FAIL |
|
|
underground conduit; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack called contr, left message, left corr notice, 300.5 top of non metallic raceway shall be minimum 18" deep
|
ELE06-00288
| Electrical Rough-In | 2/12/2006 | 2/13/2006 | 2/13/2006 8:09:34 AM | A | PART |
|
|
rough-in inspect for The Body Shop in the mall; Phone #: ###-#### Internet Inspection Request from: todd hall ok to cover clg main area and front soffit
|
ELE05-02577
| Final | 2/13/2006 | 2/13/2006 | 2/13/2006 12:00:00 AM | A | PASS |
|
|
0k to final
|
ELE05-02446
| Final | 2/13/2006 | 2/13/2006 | 2/13/2006 12:00:00 AM | A | PASS |
|
|
ok to final
|