PLM07-00381
| Water and/or Sewer | 2/12/2007 | 2/13/2007 | 2/13/2007 4:59:34 PM | P | PASS |
|
|
Mile is contact for this job Phone #: ###-####
|
PLM07-00381
| DOC - Permit Finaled | 2/13/2007 | 2/13/2007 | 2/13/2007 4:44:51 PM | P | PASS |
|
|
Mile is contact for this job Phone #: ###-####
|
PLM07-00292
| Plumbing Rough-in | 2/13/2007 | 2/13/2007 | 2/13/2007 4:43:58 PM | P | PASS |
|
|
reinspect d/f...ds
|
PLM06-01969
| Other | 2/13/2007 | 2/13/2007 | 2/13/2007 3:11:03 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 7:32:38 AM. Contact: ###-####. conference....ds
|
PLM07-00285
| Plumbing Rough-in | 2/12/2007 | 2/13/2007 | 2/13/2007 2:45:00 PM | P | PASS |
|
|
Please call ###-#### prior to arrival for inspection. Thank you. Phone #: ###-####
|
PLM07-00382
| Groundwork | 2/13/2007 | 2/13/2007 | 2/13/2007 1:50:34 PM | P | FAIL |
|
|
Inspection will be ready after 12:30pm Phone #: ###-#### needs backwater valve installed for basement fixtures and sewer for next door residence needs moved off of lot....ds
|
PLM07-00357
| Med/Gas Systems | 2/12/2007 | 2/13/2007 | 2/13/2007 11:11:46 AM | A | PART |
|
|
On site Corry @ ###-####; J603 Phone #: ###-#### 24 hr test ok...ds
|