BLD05-02608 FIRE-Final Inspection2/7/20082/13/20082/19/2008 3:42:11 PMPPASS
Life safety passed
FIR06-00215 INSP-Final Inspection2/12/20082/13/20082/13/2008 3:33:02 PMPPASS
Permit finaled
BLD07-03247 FIRE-Final Inspection2/12/20082/13/20082/13/2008 2:26:52 PMAFAIL
Repair exit signs in the warehouse. Provide approved hardware on the office doors. Provide fire extinguisher in the warehouse per review note #3. Comply with note #32 of the plan review comments for storage. Currently the steel racks are 10'-0" in height with the top of storage at 16'-0". The existing sprinkler riser does not state what class of commodity or heighth of storage it was designed for. But is did state that the denisty was .295 gpm over 2,600 square feet. steve Phone #: ###-####
FIR06-00011 INSP-Alarm Testing2/8/20082/13/20082/13/2008 2:22:29 PMADONE
Today was the beginning of the 10% testing. All a/v's worked and roughly 30 initiating devices were tested satifactory in the basement, 1st, 2nd and 3rd floors. The test will be continued tomorrow. I reminded Tom Hayes that the door mag issue to the second floor library still needs resolved prior to final sign off.
FIR07-00887 INSP-Sprinkler Rough-in2/12/20082/13/20082/13/2008 2:20:17 PMAFAIL
The inspection today was for the insulation in the overbuilds. When the bottom layer of insulation was removed I found that the overbuild had not been filled with insulation. The job superintendant stated that he would get them entirely filled and call in another inspection for tomorrow.