ESC07-00611
| Random Inspection | 2/12/2008 | 2/13/2008 | 2/14/2008 8:09:16 AM | A | PASS |
|
|
They installed round wash rock to access the perimeter of the building. Aslo the concrete washout has been dressed up with plastic liningg and dirt pile at the end of parking lot was mostly removed, and the rest was surrounded with wattle. CAS #460
|
ESC07-00904
| Tracking Control | 2/13/2008 | 2/13/2008 | 2/13/2008 6:32:37 PM | P | PASS |
|
|
Street sweeper has cleaned up all tracking onto Warms Springs Road. Tracking has been cleanedc up. Construction Entrance also has been dressed up with a top coat of wash rock. CAS #460
|
ESC08-00086
| Site Preparation | 2/12/2008 | 2/13/2008 | 2/13/2008 6:23:38 PM | P | CANC |
|
|
not ready yet
|
ESC07-00904
| Random Inspection | 2/13/2008 | 2/13/2008 | 2/13/2008 10:15:11 AM | A | PART |
|
|
VERBAL CORRECTION NOTICE Found tracking on onto Warmsprings rd. Discussed with Russ over clean-up. He has a street sweeper coming trough this morning. Also I explained that he needs a stabilized construction parking area. Will re-inspect today at the end of the day concerning the tracking. Will reinspect for construction parking on Friday the 15th of Feb. 2008 in the afternoon. Also explained that he needs to
|
ESC08-00086
| Conference | 2/13/2008 | 2/13/2008 | 2/13/2008 9:29:25 AM | A | PART |
|
|
Met with Jim Larkin (project super) and Jim Pickard (ACHD). Discussed with them over sidewalk and and road improvements. Also to figure out where construction entrance will be located for access. Will do a follow-up inspection for site preperation when Jim Larkin contacts me when perimeter control has been established. Then the "Stop Work Order" can be released. CAS #460
|
ESC07-00819
| Site Preparation | 2/12/2008 | 2/13/2008 | 2/13/2008 8:03:10 AM | P | CANC |
|
|
check up on washout area and stockpile stabilization at back of project.
|