ESC08-00763
| BMP Violation | 2/13/2009 | 2/13/2009 | 2/17/2009 9:51:33 AM | P | PART |
|
|
Verbal to contractor: Need to re-install sediment perimeter controls at back of lot. Clean up all sediment debris of of all hard surfaces. Maintain trash pick up surrounding the lot area. They also provided a concrete washout out pit for both lots under construction. Will re-inspect on 2/20/09.
|
ESC08-00991
| BMP Violation | 2/12/2009 | 2/13/2009 | 2/13/2009 3:53:53 PM | P | DONE |
|
|
Contractors and Public Works said that by the end of the day that issues will be corrected. Will re-inspect on 2/17/09AM
|
ESC08-00491
| Tracking Control | 2/6/2009 | 2/13/2009 | 2/13/2009 3:52:22 PM | P | CANC |
|
|
Moved to 2/17/09 PM.
|
ESC08-00532
| General Inspection | 2/12/2009 | 2/13/2009 | 2/13/2009 3:27:12 PM | A | PASS |
|
|
|
ESC08-00821
| General Inspection | 2/13/2009 | 2/13/2009 | 2/13/2009 10:29:41 AM | P | PART |
|
|
Verbal C/N to RP: 1. Maintain both construction accesses on north(widen and stabilize) and east(remove dirt puddles) side of project. 2. Clean up valley gutter infront of the east side construction acccess. Found concrete residuel. Will re-inspect on 2/18/09.
|
ESC08-00457
| General Inspection | 2/6/2009 | 2/13/2009 | 2/13/2009 9:58:16 AM | A | PART |
|
|
Imformed the project super due to the RP being ill: 1. Maintain concrete washout. 2. Place signage at both washout pits. 3. Keep up on the good house keeping. Willnre-inspect on 2/19/09 AM.
|