FIR11-00479
| INSP-Final Inspection | 2/10/2012 | 2/13/2012 | 2/13/2012 4:07:45 PM | P | CANC |
|
|
Can not final until previous corrections on wrong size piping and routing in remote area has been addressed.
|
FIR11-00543
| INSP-Sprinkler Rough-in | 2/13/2012 | 2/13/2012 | 2/13/2012 4:01:53 PM | P | PASS |
|
|
See the city approved for additional rooms that piping is ok to cover.
|
BLD11-00232
| FIRE-Final Inspection | 2/13/2012 | 2/13/2012 | 2/13/2012 2:15:28 PM | P | FAIL |
|
|
Scott Phone #: ###-#### Could not make contact with the contact person. I went to the job site and spoke to the manager but she did not know anything about the inspection. So no inspection was performed.
|
FIR11-00612
| INSP-Sprinkler Rough-in | 2/10/2012 | 2/13/2012 | 2/13/2012 2:04:10 PM | A | PASS |
|
|
The TJ Maxx canopy is complete including the earthquake bracing. Still need to test the tamper switches.
|
FIR12-00009
| INSP-Final Inspection | 2/13/2012 | 2/13/2012 | 2/13/2012 1:59:41 PM | P | PASS |
|
|
Permit finaled. EOL voltage was verified ok.
|
FIR11-00642
| INSP-Final Inspection | 2/10/2012 | 2/13/2012 | 2/13/2012 1:05:49 PM | P | FAIL |
|
|
Todays inspection covered the new NAC panel and its interconnection with the existing FACP the testing of the new smoke detectors in Corridor 222 and the fire sprinkler riser tamper switches. The location of the inspectors tests were not immediately known. Heights and spacing of all of the new audio/visuals was also performed. I found several locations wheres a/v's were missing, a/v's overspaced and manual pull stations missing. The duct smoke detectors and NAC circuit testing was not performed. I spoke to Chad with Bishop Kelly about signage on the FACP room door and the fire sprinkler riser room door. I spoke to Colton about as-builts showing the door holder being deleted in Corridor 222.
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 2/13/2012 | 2/13/2012 | 2/13/2012 12:43:23 PM | A | PASS |
|
|
See the city approved plans for piping locations on the second floor that are ok to cover.
|
BLD11-02958
| FIRE-Conference | 2/10/2012 | 2/13/2012 | 2/13/2012 12:36:26 PM | A | DONE |
|
|
Justin had questions about the fire sprinkler coverage. It appears one pendant head in the new restroom needs to be plugged and the insulation at the roof repaired since it is obstruction the upright sprinkler coverage in several locations. I also went over fire extinguisher requirements with him
|
FIR11-00479
| INSP-Sprinkler Rough-in | 2/10/2012 | 2/13/2012 | 2/13/2012 8:45:24 AM | A | FAIL |
|
|
The pipe size installed in Corridor 222 does not match the approved plans. Also per the fitter some pipe routing changes were needed in the remote area. Piping can not be covered.
|