Inspections for the day of: Friday, February 13, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00090 INSP-Final Inspection2/13/20152/13/20152/13/2015 1:39:45 PMPPASS
Permit finaled
FIR14-00848 INSP-Sprinkler Rough-in2/12/20152/13/20152/13/2015 1:10:44 PMPPASS
Tenting passed. Piping can be covered.
FIR15-00071 INSP-Sprinkler Rough-in2/12/20152/13/20152/13/2015 1:09:38 PMAPASS
Rough-in for flex heads appears ok. Will need another rough-in when t-bar has been installed and pendants placed.
FIR15-00093 INSP-Conference2/13/20152/13/20152/13/2015 1:07:36 PMPDONE
Kieth and I discussed fire alarm device placement.
BLD14-02980 FIRE-Final Inspection2/12/20152/13/20152/13/2015 11:57:14 AMAPASS
life safety passed
BLD14-01208 FIRE-Final Inspection2/13/20152/13/20152/13/2015 10:46:17 AMPPASS
life safety passed. Acid detection not required per plan review.
BLD13-00204 FIRE-Final Inspection2/12/20152/13/20152/13/2015 10:44:49 AMAPASS
Life safety passed
FIR15-00074 INSP-Final Inspection2/12/20152/13/20152/13/2015 10:44:00 AMAPASS
Permit finaled
FIR15-00094 INSP-Final Inspection2/12/20152/13/20152/13/2015 9:43:03 AMAPASS
Piping is ok to cover
BLD14-03583 FIRE-Final Inspection2/13/20152/13/20152/13/2015 9:42:33 AMPPASS
Life safety passed
FIR14-00934 INSP-Final Inspection2/13/20152/13/20152/13/2015 9:42:10 AMPPASS
Permit finaled