BLD16-02992
| FIRE-Final Inspection | 2/10/2017 | 2/13/2017 | 2/13/2017 3:11:11 PM | A | PASS |
|
|
Life safety passed
|
FIR16-00595
| INSP-Final Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 3:10:51 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00595
| INSP-Alarm Testing | 2/10/2017 | 2/13/2017 | 2/13/2017 3:09:48 PM | A | PASS |
|
|
Permit finaled
|
BLD16-04014
| FIRE-Final Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 1:57:57 PM | P | PASS |
|
|
life safety passed
|
BLD17-00200
| FIRE-Final Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 1:24:57 PM | P | FAIL |
|
|
Need to repair the smoke evac system and repair or remove the two emergency lights.
|
FIR16-00252
| INSP-Final Inspection | 2/10/2017 | 2/13/2017 | 2/13/2017 10:57:16 AM | A | PASS |
|
|
Permit finaled
|
BLD16-04096
| FIRE-Final Inspection | 2/10/2017 | 2/13/2017 | 2/13/2017 8:18:53 AM | A | PASS |
|
|
Life safety passed
|
FIR17-00018
| INSP-Final Inspection | 2/10/2017 | 2/13/2017 | 2/13/2017 8:18:31 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00588
| INSP-Sprinkler Rough-in | 2/13/2017 | 2/13/2017 | 2/13/2017 12:00:00 AM | P | PASS |
|
|
2nd floor sprinkler piping is okay to cover
|