Inspections for the day of: Thursday, February 13, 2020.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR20-00022 INSP-Final Inspection2/12/20202/13/20202/13/2020 3:08:01 PMPPASS
Final inspection for scope of work is complete.

nate Phone #: ###-####
FIR20-00067 INSP-Sprinkler Rough-in2/12/20202/13/20202/13/2020 1:10:48 PMAPART
Rough in inspection for overhead fire sprinkler piping in area of work complete. A follow up inspection will be required before cover can be approved after finish pendant heads are installed.

Contact is Tanner Loomis please call him 30 mins before inspections. Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR20-00026 INSP-Final Inspection2/12/20202/13/20202/13/2020 1:09:34 PMAPASS
Final fire sprinkler inspection for scope of work complete.

call for access 20 mins- Glen Phone #: ###-####
FIR20-00026 INSP-Sprinkler Rough-in2/12/20202/13/20202/13/2020 1:09:03 PMAPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.

call for access 20 mins ahead- Glen Phone #: ###-####
FIR20-00085 INSP-Sprinkler Rough-in2/13/20202/13/20202/13/2020 11:03:15 AMPPART
Partial rough to cover inspection for overhead fire sprinkler piping/tenting (all tenting in place at time of this inspection) is complete, all areas approved except for the area notated on the site city approved drawings where piping from level 1 to level 2 is not installed, piping needs installed and a follow up inspection will be required before cover.

for coverOverhead rough and tenting, call Anthony when heading out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-02339 FIRE-Conference2/13/20202/13/20202/13/2020 10:22:59 AMADONE
Discussed temporary standpipe approximately 2 weeks ago with site foreman with ESI, temp standpipe has net been installed as of this entry, per section 3313.1 of the 2015 IFC states that a temporary standpipe is required when construction reaches 40 feet, project is past the 40 foot height measurement. ESI superintendent has been notified that the temporary standpipe needs to be installed and operational by 21FEB2020 or a stop work will be placed on project until temporary standpipe is installed. This has been discussed with and supported by Joe Bruce, Fire section supervisor as well as Romeo Gervais, Boise City Fire Marshall.
FIR20-00075 INSP-Sprinkler Rough-in2/13/20202/13/20202/13/2020 9:50:23 AMAPART
Rough in inspection for overhead fire sprinkler piping is complete, piping between conditioned spaces approved for cover, tenting inspection to be completed at a later date, piping requiring freeze protection is not approved for cover, as-builts to show minor changes to piping due too structural beams.

Rough to cover. Call Anthony when headed out. He has an inspection with Troy at 8am on another project. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-03892 FIRE-Final Inspection2/12/20202/13/20202/13/2020 7:12:39 AMAPASS
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.

Phone #: ###-#### Inspection requested via web by Chase Cheverton
FIR19-00803 INSP-Final Inspection2/11/20202/13/20202/13/2020 7:11:31 AMAPASS
Final fire alarm inspection for scope of work complete.

Needs to be done at 7:00 Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00797 INSP-Final Inspection2/11/20202/13/20202/13/2020 7:10:49 AMAPASS
Final fire sprinkler inspection for area of work is complete.

Needs to be done at 7:00 am Phone #: ###-#### Inspection requested via web by Sam Ball