PLM96-00239
| INSP - Ground work | 2/14/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | | PART |
|
|
/ / 330 - partial g/w ok needs test
|
PLM96-00239
| INSP - Ground work | 2/13/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | A | NR |
|
|
02/13/96 330 - RESCHEDULE AS PER BVANDEGRIFT
|
PLM96-00133
| INSP - Plumbing Rough-in | 2/13/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | A | PART |
|
|
02/13/96 330 - did this last night
|
PLM96-00213
| INSP - Plumbing Rough-in | 2/13/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | A | PASS |
|
|
02/13/96 330 - SAID HE WOULD BE HOME ri ok with running trap on the shower
|
PLM96-00228
| INSP - Sewer and Water lines | 2/13/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | A | PASS |
|
|
02/13/96 330 - REINSPECTION
|
PLM96-00252
| INSP - Plumbing Rough-in | 2/13/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | A | PART |
|
|
02/13/96 330 - BLDG #4-CONTACT: GEORGE KARCHER PAGE AT THE FRONT GATE 7990 partial r/i ok 2nd floor cup bld restroom remodel
|
PLM96-00255
| INSP - Ground work | 2/14/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | P | PASS |
|
|
02/14/96 330 - ONLY G\W
|
PLM96-00030
| INSP - Final | 2/14/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | P | NR |
|
|
02/14/96 330 -
|
PLM96-00227
| INSP - Plumbing Rough-in | 2/14/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | P | FAIL |
|
|
02/14/96 330 - 2 W/C 3 LAV 3 TUB 1 SINK 1 W/H 1 W/H water system test failed, hang 1 1/2" revents every 4' in both bath's
|
PLM96-00245
| INSP - Sewer and Water lines | 2/14/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | P | PASS |
|
|
02/14/96 330 - REINSPECTION
|
PLM96-00246
| INSP - Sewer and Water lines | 2/14/1996 | 2/14/1996 | 2/14/1996 12:00:00 AM | P | PASS |
|
|
02/14/96 330 - THIS IS READY AT 3:00 TODAY
|