Inspections for the day of: Monday, February 14, 2000.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-00329 BLD-Final2/14/20002/14/20002/15/2000 12:00:00 AMPPASS
late pm ###-#### Card to owner. 2/15/00 1:17:32 PM
BLD99-03016 BLD-Framing/Rough-in2/11/20002/14/20002/14/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/11/2000 at 11:33:56. Contact: ###-####. Complete sheathing @ roof. 2/14/00 2:16:29 PM
BLD98-03724 BLD-Framing/Rough-in2/11/20002/14/20002/14/2000 12:00:00 AMAPART
Framing R/I for cover. Gene; ###-####. 408's area, WIP ok to continue; need both layers @ 2hr wall & firestops @ plates. 2/14/00 2:15:37 PM
BLD99-01662 BLD-Final2/11/20002/14/20002/14/2000 12:00:00 AMAPASS
Final reinspect - Cathy has the card Signed card @ office. 2/14/00 2:15:30 PM
BLD00-00086 BLD-Footing2/11/20002/14/20002/14/2000 12:00:00 AMAPART
###-#### FTG's. 2/14/00 2:16:37 PM
BLD99-02519 BLD-Final2/11/20002/14/20002/14/2000 12:00:00 AMAFAIL
Re-inspection. Donna; ###-####. Need Htg. 2/14/00 2:16:50 PM
MEC00-00460 Final2/14/20002/14/20002/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/14/2000 at 08:04:14. Contact: ###-####. No address posted, unable to locate. 2/15/00 1:18:00 PM
MEC00-00476 Rough-in2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
###-####
MEC00-00476 Pressure Test2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
###-####
BLD00-00021 BLD-Framing/Rough-in2/11/20002/14/20002/14/2000 12:00:00 AMPFAIL
Nick;###-####. C/N; ok to insul. 2/15/00 1:17:05 PM
BLD00-00172 BLD-Foundation2/14/20002/14/20002/14/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/14/2000 at 10:58:43. Contact: ###-####. Poured. 2/15/00 1:17:43 PM
BLD99-03150 BLD-Conference2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
reviewed spec insp reports
BLD99-03181 BLD-Conference2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
reviewed spec insp reports, spoke w/ Bob Thormton, proj. supt.
BLD99-02518 BLD-Conference2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
REVIEWED SPEC. INSP. REPORTS
BLD99-03639 BLD-Conference2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
REVIIEWED SPEC INSP AGREEMENT & REPORTS; PARTIAL PERMIT ONLY FOR PROJECT AT THIS TIME
BLD99-03043 BLD-Conference2/14/20002/14/20002/14/2000 12:00:00 AMPPASS
W/SUPT'


BLD99-03288 BLD-Foundation2/14/20002/14/20002/14/2000 12:00:00 AMPPART
Ret. wall, int. ftg. wall.