PLM00-03670
| Other | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 14:15:34. Contact: ###-####.oked water main and lines to rooftop swamp coolers. Lee 2/14/2001 10:00:47 AM
|
PLM01-00332
| Groundwork | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 15:57:08. Contact: ###-####.g/w ok and waste in walls, no water in walls yet. 2/14/2001 10:10:30 AM
|
PLM00-04403
| Water and/or Sewer | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 309 On 2/14/2001 10:15:40 AM
|
PLM01-00280
| Groundwork | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 309 On 2/14/2001 10:14:54 AM interceptor discharge piping 2/15/2001 7:46:49 AM
|
PLM01-00325
| Plumbing Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 2/14/2001 2:01:59 PM added hub drain for rp valve. 2/15/2001 7:48:03 AM
|
PLM00-02169
| Groundwork | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 309 On 2/14/2001 2:02:38 PM
|
PLM00-02169
| Final | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 309 On 2/14/2001 2:00:05 PM valves tested ok, still have one sink to connect up front 2/15/2001 7:45:20 AM
|