Inspections for the day of: Wednesday, February 14, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02334 BLD-Final2/13/20012/14/20012/14/2001 12:00:00 AMAFAIL
Steve ###-####...c/n landings, ok for t/o 2/14/2001 12:44:18 PM
BLD00-01150 BLD-Conference2/14/20012/14/20012/14/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 2/14/2001 9:30:37 AM w/ new contractor re insp process
BLD00-02964 BLD-Conference2/14/20012/14/20012/14/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 2/14/2001 11:31:54 AM w/ Bob Ross re final: may not have roll-down assy in place for final, will consult 325
BLD00-03418 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/14/2001 at 11:23:39. Contact: ###-####. c/n, straps, brg. fasteners,..address previous c/n; no insul. 2/14/2001 5:05:28 PM
BLD00-01151 BLD-Conference2/14/20012/14/20012/14/2001 12:00:00 AMPPART
Added by Inspector: 340 On 2/14/2001 5:08:59 PM w/bldr re insps
BLD00-03337 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPPART
###-####; ok to cover walls; has to provide occ. separation adjacent to kitchen ..tight to roof deck at existing. 2/14/2001 3:09:40 PM 2/14/2001 3:12:19 PM
BLD00-03341 BLD-Final2/13/20012/14/20012/14/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/13/2001 at 17:19:50. Contact: ###-####...need to show proof of escrow for completion of landscape & retaining wall. 2/14/2001 3:48:57 PM struct ok 2/14/2001 3:59:16 PM
BLD00-01151 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPFAIL
###-####; c/n ...complete firestops, doors at corridors, seismic at ceilings, etc. 2/15/2001 11:43:47 AM