PLM01-00328
| Water and/or Sewer | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
|
PLM00-04196
| Plumbing Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 19:18:06. Contact: ###-####.cross sectional area not met from required 4' building 2/14/2001 12:54:08 PM drain through roof 2/14/2001 12:54:31 PM 2/14/2001 12:56:25 PM
|
PLM00-03920
| Plumbing Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 09:30:23. Contact: ###-####.
|
PLM01-00339
| Final | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | CANC |
|
|
###-####
|
PLM01-00339
| Water Softner Final | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 352 On 2/14/2001 11:37:37 AM
|