Inspections for the day of: Wednesday, February 14, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02996 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
###-####
BLD00-03397 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
###-####
ok to ins. 2/14/2001 11:23:16 AM
BLD00-03615 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/13/2001 at 14:40:31. Contact: ###-####.
trades not signed off,, no inspection made 2/14/2001 10:23:19 AM
MEC00-04496 Final2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/13/2001 at 16:37:25. Contact: ###-####.
MEC01-00074 Final2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/13/2001 at 16:38:27. Contact: ###-####.
MEC00-04353 Final2/14/20012/14/20012/14/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/14/2001 at 08:18:06. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/14/2001 at 08:47:57.
MEC00-04231 Final2/14/20012/14/20012/14/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/14/2001 at 09:22:18. Contact: ###-####.
no time 2/14/2001 4:57:02 PM
BLD00-01497 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPCANC
###-####
no time 2/14/2001 4:52:17 PM
BLD00-02996 BLD-Energy code compliance2/14/20012/14/20012/14/2001 12:00:00 AMPPASS
Scheduled by Inspector: 415 On 2/14/2001 11:28:21 AM
MEC01-00241 Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMPPASS
Steve ###-####
BLD00-02561 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMPFAIL
Scheduled by Inspector: 415 On 2/13/2001 2:31:31 PM
c/n posted, need fire sprinkler rouph b4 frame 2/14/2001 3:53:23 PM