BLD00-02996
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03397
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
###-####
ok to ins. 2/14/2001 11:23:16 AM
|
BLD00-03615
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 14:40:31. Contact: ###-####.
trades not signed off,, no inspection made 2/14/2001 10:23:19 AM
|
MEC00-04496
| Final | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 16:37:25. Contact: ###-####.
|
MEC01-00074
| Final | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 16:38:27. Contact: ###-####.
|
MEC00-04353
| Final | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 08:18:06. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/14/2001 at 08:47:57.
|
MEC00-04231
| Final | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 09:22:18. Contact: ###-####.
no time 2/14/2001 4:57:02 PM
|
BLD00-01497
| BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | CANC |
|
|
###-####
no time 2/14/2001 4:52:17 PM
|
BLD00-02996
| BLD-Energy code compliance | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 2/14/2001 11:28:21 AM
|
MEC01-00241
| Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
Steve ###-####
|
BLD00-02561
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 415 On 2/13/2001 2:31:31 PM
c/n posted, need fire sprinkler rouph b4 frame 2/14/2001 3:53:23 PM
|