Inspections for the day of: Wednesday, February 14, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03326 BLD-Final2/13/20012/14/20012/14/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 02/13/2001 at 13:52:16. Contact: ###-####. No access, hwood floors were wet, contacted contractor, cancelled. 2/14/2001 10:45:38 AM
MEC01-00345 Pressure Test2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/13/2001 at 15:09:07. Contact: ###-####.
MEC01-00372 Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/13/2001 at 15:37:12. Contact: ###-####.
MEC01-00372 Pressure Test2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/13/2001 at 15:37:43. Contact: ###-####.
BLD01-00200 BLD-Foundation2/13/20012/14/20012/14/2001 12:00:00 AMAPASS
###-####
BLD00-03673 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMAPART
c/n issued--Blocking needed between truess on bearing wall at porch, Truss A-3 in garage needs nailing per truss detail, straps needed each side of 2ply header in Master bedroom, hangers in bedroom number 2 needs nailing completed, hanger number tha29. 2/14/2001 10:06:37 AM
BLD00-03493 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMPCANC
###-#### as late as possible: Transfered to inspector #407 2/14/2001 3:58:13 PM
BLD00-03601 BLD-Framing/Rough-in2/13/20012/14/20012/14/2001 12:00:00 AMPPASS
###-####Shear not framing, ok to side. 2/14/2001 2:17:58 PM
BLD00-02496 BLD-Final2/13/20012/14/20012/14/2001 12:00:00 AMPPASS
###-####C. of C issued, #20115. 2/14/2001 10:33:08 AM
MEC01-00412 Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/14/2001 at 07:31:31. Contact: ###-####.
BLD00-03565 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPFAIL
Kent ###-####: c/n posted--Address needed on site; hd's on porch column needs nailing; fireblocks needed at stairs and in great room, stairs don't comply with code, header is needed in dinning room, headers in b.fast nook and m.bed not per plans. 2/14/2001 1:38:21 PM
BLD01-00155 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPPASS
shear Rick ###-#### SHEAR--OK to side. 2/14/2001 4:07:43 PM
BLD00-03325 BLD-Framing/Rough-in2/14/20012/14/20012/14/2001 12:00:00 AMPFAIL
shear wall Greg ###-####: SHEAR--c/n issued--post address, complete nailing per plans, complete installation of hd in back, provide engineering or retrofitting of hd at back of building where changed from plans. 2/14/2001 3:56:52 PM
BLD00-03604 BLD-Foundation2/14/20012/14/20012/14/2001 12:00:00 AMPPART
late pm ###-####: rebar tied in place-looks good, hd reviewed with contractor but at time of inspection not in place. 2/14/2001 3:14:53 PM