BLD00-03326
| BLD-Final | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 13:52:16. Contact: ###-####. No access, hwood floors were wet, contacted contractor, cancelled. 2/14/2001 10:45:38 AM
|
MEC01-00345
| Pressure Test | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 15:09:07. Contact: ###-####.
|
MEC01-00372
| Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 15:37:12. Contact: ###-####.
|
MEC01-00372
| Pressure Test | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 15:37:43. Contact: ###-####.
|
BLD01-00200
| BLD-Foundation | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03673
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | A | PART |
|
|
c/n issued--Blocking needed between truess on bearing wall at porch, Truss A-3 in garage needs nailing per truss detail, straps needed each side of 2ply header in Master bedroom, hangers in bedroom number 2 needs nailing completed, hanger number tha29. 2/14/2001 10:06:37 AM
|
BLD00-03493
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | CANC |
|
|
###-#### as late as possible: Transfered to inspector #407 2/14/2001 3:58:13 PM
|
BLD00-03601
| BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
###-####Shear not framing, ok to side. 2/14/2001 2:17:58 PM
|
BLD00-02496
| BLD-Final | 2/13/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
###-####C. of C issued, #20115. 2/14/2001 10:33:08 AM
|
MEC01-00412
| Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 07:31:31. Contact: ###-####.
|
BLD00-03565
| BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | FAIL |
|
|
Kent ###-####: c/n posted--Address needed on site; hd's on porch column needs nailing; fireblocks needed at stairs and in great room, stairs don't comply with code, header is needed in dinning room, headers in b.fast nook and m.bed not per plans. 2/14/2001 1:38:21 PM
|
BLD01-00155
| BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PASS |
|
|
shear Rick ###-#### SHEAR--OK to side. 2/14/2001 4:07:43 PM
|
BLD00-03325
| BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | FAIL |
|
|
shear wall Greg ###-####: SHEAR--c/n issued--post address, complete nailing per plans, complete installation of hd in back, provide engineering or retrofitting of hd at back of building where changed from plans. 2/14/2001 3:56:52 PM
|
BLD00-03604
| BLD-Foundation | 2/14/2001 | 2/14/2001 | 2/14/2001 12:00:00 AM | P | PART |
|
|
late pm ###-####: rebar tied in place-looks good, hd reviewed with contractor but at time of inspection not in place. 2/14/2001 3:14:53 PM
|