BLD01-00186
| BLD-Final | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PASS |
|
|
mike ###-#### fn , card to Cathy 2/14/2002 1:42:29 PM
|
MEC02-00392
| Pressure Test | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 15:05:17. Contact: ###-####.
|
BLD00-01649
| BLD-Final | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | NR |
|
|
###-#### mel
|
BLD00-03496
| BLD-Conference | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PASS |
|
|
SID ###-####, need signatures, fix stairs, seal demising. 2/14/2002 12:23:57 PM
|
BLD01-03277
| BLD-Framing/Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 340 On 2/13/2002 5:38:15 PM 8699278, ryan, c/n: shaft, chase, lid, remove insul. face paper. 2/14/2002 1:39:33 PM
|
MIS02-00021
| BLD-Conference | 2/12/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 340 On 2/12/2002 6:32:53 PM 10 am...chk w/ Rick Jackson; sent to 420? 2/14/2002 4:29:42 PM
|
BLD01-00602
| BLD-Framing/Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 14:50:16. Contact: ###-####. c/n ok to insul. 2/14/2002 6:25:55 PM
|
BLD01-00609
| BLD-Framing/Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 14:51:16. Contact: ###-####. c/n, ok to insul 2/14/2002 6:25:44 PM
|
BLD01-00234
| BLD-Wall cover | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 10:20:03. Contact: ###-####....need listing for glass block at 2hr wall 2/14/2002 4:37:02 PM
|
MIS02-00021
| COD-Conference | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/14/2002 1:42:04 PM w/ Cotner & rick j.
|