ELE01-02526
| Electrical Rough-In | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 412 On 2/14/2002 8:47:26 AM ok cover wall
|
ELE00-03836
| Final | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 412 On 2/14/2002 8:48:00 AM ok final
|
ELE01-03960
| Electrical Rough-In | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 412 On 2/14/2002 8:49:24 AM ok cover walls & ok part surface installation
|
ELE01-00870
| Electrical Rough-In | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 07:44:22. Contact: ###-####. ok cover ceiling 2/14/2002 8:46:34 AM
|
ELE01-04343
| Final | 2/13/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 10:47:09. Contact: ###-####. ok final 2/14/2002 12:38:36 PM
|
ELE02-00395
| Electrical Rough-In | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | NR |
|
|
###-#### GLENN not ready called contractor he to call for another inspection 2/14/2002 3:53:04 PM
|
ELE01-04103
| Final | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 10:28:58. Contact: ###-####. ok final survey need outlet in floor by back sliding door 2/14/2002 12:59:47 PM
|
ELE02-00409
| Electrical Rough-In | 2/14/2002 | 2/14/2002 | 2/14/2002 12:00:00 AM | P | FAIL |
|
|
###-#### nec 210.52(c) failed called contractor 2/14/2002 1:48:12 PM
|