Inspections for the day of: Monday, February 14, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-00388 Plumbing Rough-in2/11/20052/14/20052/14/2005 12:00:00 AMAPASS
ri ok 2/14/2005 11:11:24 AM
PLM05-00387 Final2/11/20052/14/20052/14/2005 12:00:00 AMPPASS
check dcva in crawl and pvb on sp water service final ok 2/14/2005 10:47:23 AM
PLM05-00348 Plumbing Rough-in2/13/20052/14/20052/14/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/13/2005 at 10:14:00 AM. Contact: ###-####. ri ok 2/14/2005 2:02:03 PM
PLM05-00346 Plumbing Rough-in2/13/20052/14/20052/14/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/13/2005 at 10:16:22 AM. Contact: ###-####. ri ok 2/14/2005 2:02:13 PM
PLM05-00396 Plumbing Rough-in2/14/20052/14/20052/14/2005 12:00:00 AMPPASS
###-#### CRAIG ri ok 2/14/2005 11:26:36 AM
PLM04-03382 Final2/14/20052/14/20052/14/2005 12:00:00 AMPNR
This is ready now. Thank you; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel seal around floor sink at front counter, open up toe kick and seal around floor sink at soda mechines, set all equipment, ice tea, etc. pipe water heater t&p drain. will do a walk through with Bill Thompson for a cross connection control survey. run ice maker bin drain seperatly. 2/14/2005 2:50:43 PM
PLM05-00397 Plumbing Rough-in2/14/20052/14/20052/14/2005 12:00:00 AMPPASS
Contact is Chris; Phone #: ###-#### Internet Inspection Request from: Roger Patterson remodel no softenor ri ok 2/14/2005 11:58:56 AM
PLM05-00398 Plumbing Rough-in2/14/20052/14/20052/14/2005 12:00:00 AMPPASS
ryan ###-#### ri ok 2/14/2005 11:18:56 AM
PLM05-00015 Final2/14/20052/14/20052/14/2005 12:00:00 AMPPASS
Internet Inspection Request from: Kim Alderson final ok 2/14/2005 11:02:41 AM