BLD02-03096
| FIRE-Final Inspection | 2/11/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | A | PASS |
|
|
Fire life safety passed. Address to be mounted before structural sign off 2/14/2005 10:16:06 AM
|
BLD04-01537
| FIRE-Final Inspection | 2/11/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | A | FAIL |
|
|
No access to business and left message with contact phone number 2/14/2005 8:49:02 AM
|
FIR04-00656
| INSP-Sprinkler Rough-in/Hydro | 2/14/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | A | PART |
|
|
The rest of the fourth floor and first floor is ok to cover and the standpipes are ok. Need to verify clearance around standpipe at penatrations at fourth floor, overspaced heads in the north storage rooms on second and third floors and all piping for the front drive through. 2/14/2005 9:49:48 AM
|
BLD04-02775
| FIRE-Final Inspection | 2/11/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | A | PASS |
|
|
Life safety finaled 2/14/2005 12:00:13 PM
|
MIS05-00003
| FIR-Final | 2/11/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | P | PASS |
|
|
Life safety finaled 2/14/2005 10:45:46 AM
|
FIR04-00358
| INSP-Sprinkler Rough-in | 2/14/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | P | PART |
|
|
See approved plans for first floor locations ok to cover 2/14/2005 4:07:28 PM
|
BLD04-02454
| FIRE-Final Inspection | 2/14/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled 2/14/2005 1:28:52 PM
|
FIR05-00011
| INSP-Final Inspection | 2/14/2005 | 2/14/2005 | 2/14/2005 12:00:00 AM | P | PASS |
|
|
Fire alarm finaled 2/14/2005 3:17:46 PM
|