Inspections for the day of: Tuesday, February 14, 2006.
Number of inspections: 5
Percentage of inspections complete: 80 %
Percentage of inspections not complete: 20 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01845 BLD-Final2/13/20062/13/2006 P 
BLD05-00487 BLD-Aging Inspection2/14/20062/14/20062/16/2006 1:07:11 PMPNR
Final pending completion of the concourse fire alarm upgrade to be inspected next month per conversation with contractor.
FIR05-00659 INSP-Sprinkler Rough-in/Hydro2/14/20062/14/20062/15/2006 8:30:12 AMPFAIL
Head is overspaced in supply room 124 see NFPA 13 8.6.3.2.4 and 3.3.20, need the correct temp head installed in the server room within direct air flow of the unit heater, need to correct the 4-way EQ brace at 2" main, missing retaining strap at 1 1/4 branch line hanger, provide approved resubmittals reflecting changes showing added DP, changed room layouts, deleted closets, added heads at walls and new 2" line to added heads in the restrooms, rooms on the east side are covered and not inspected at this time, provide verification the exposed wood above the ceiling at the south end is treated, new office area only inspected for rough-in as marked on plans at this time.
FIR05-00594 INSP-Sprinkler Rough-in2/13/20062/14/20062/14/2006 3:37:47 PMADONE
On site confrence to discuss location of the penthouse mechanical room standpipe hose connections.
FIR05-00555 INSP-Final Inspection2/10/20062/14/20062/14/2006 12:07:45 PMAFAIL
Provide access doors at two locations as indicated on approved plans for in-duct smoke detectors, provide signage at the door to the FACP room, replace non-functional batteries in the FACP.