ELE07-00516
| Electrical Rough-In | 2/14/2007 | 2/14/2007 | 2/14/2007 4:09:27 PM | P | PASS |
|
|
Inspect walls for cover only. Please call if you have any questions. Thanks Jeff Phone #: ###-#### walls only downstairs ok to cover
|
ELE07-00524
| Electrical Rough-In | 2/14/2007 | 2/14/2007 | 2/14/2007 2:59:30 PM | P | PASS |
|
|
trench inspection Phone #: ###-#### ok to cover trench
|
ELE06-04055
| Electrical Rough-In | 2/14/2007 | 2/14/2007 | 2/14/2007 2:03:02 PM | P | FAIL |
|
|
jerrod; Phone #: ###-#### Internet Inspection Request from: Victoria Beall called, left message, nec 680.10 and 300.5 u/g cnd shall be min 18" deep
|
ELE06-04457
| Final | 2/13/2007 | 2/14/2007 | 2/14/2007 1:28:43 PM | P | PART |
|
|
bob - partial occupancy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith signed struct card for part t/o, left corr notice,nec 408.4 panel schedule shall be complete, clear and concise, 300.11(A)(1) no low voltage wiring shall be on ceiling, 725.3(B) abandoned lv cable shall be removed, talked to contractor
|
ELE06-03591
| Final | 2/12/2007 | 2/14/2007 | 2/14/2007 11:42:58 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/12/2007 at 5:22:15 PM. Contact: ###-####. ok to final
|
ELE06-04191
| Permanent Service | 2/13/2007 | 2/14/2007 | 2/14/2007 10:18:09 AM | A | FAIL |
|
|
fred ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith called contr., left corr notice, nec 250.24(A) grounding electrode conductor shall be connected to grounded service conductor
|
ELE07-00507
| Final | 2/13/2007 | 2/14/2007 | 2/14/2007 9:43:46 AM | A | PASS |
|
|
Call ###-#### before you arrive to gain access. Work performed by Nick Felsted. Phone #: ###-#### ri and final ok
|
ELE07-00506
| Electrical Rough-In | 2/13/2007 | 2/14/2007 | 2/14/2007 8:47:14 AM | A | PASS |
|
|
Ready for final. Jason(tech). Store opens 8:00am, the earlier the better. Manager is Anna Phone #: ###-#### ri ok see final
|
ELE07-00506
| Final | 2/14/2007 | 2/14/2007 | 2/14/2007 8:46:42 AM | A | PASS |
|
|
Ready for final. Jason(tech). Store opens 8:00am, the earlier the better. Manager is Anna Phone #: ###-#### ok to final
|
ELE07-00026
| Electrical Rough-In | 2/13/2007 | 2/14/2007 | 2/14/2007 8:21:40 AM | A | PASS |
|
|
Phone #: ###-#### walls east 1/2 only ok to cover, told elect to put on nail plates
|
ELE06-04592
| Electrical Rough-In | 2/13/2007 | 2/14/2007 | 2/14/2007 7:52:47 AM | A | PART |
|
|
lea - borders - 1047 ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith soffit ok to cover anop
|