Inspections for the day of: Wednesday, February 14, 2007.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-03025 BLD-Final2/13/20072/14/20072/15/2007 2:42:13 PMPPART
troy; Phone #: ###-#### Internet Inspection Request from: Patricia Smit. All issues have been resolved except for issues noted on final Aff. letter from special insp. agency. Noted items must be resolved and approved by structural engineer prior to perm occ.
MIS07-00024 BLD-Final2/12/20072/14/20072/14/2007 4:34:26 PMPNR
SANDY - CALL FIRST FOR ACCESS; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Fire failed. No insp conducted.
BLD07-00166 BLD-Framing/Rough-in2/13/20072/14/20072/14/2007 4:13:01 PMPPASS
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Inter non load bearing partition wall. Pending elec.
BLD03-02388 BLD-Framing/Rough-in2/14/20072/14/20072/14/2007 3:39:42 PMPFAIL
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt. Needs to go back to plan review for hand stack roof. Winder treds from stairway has been eliminated and floor plan has changed slightly, should update with plan review. Needs to complete airseal package and install boots on studs at bearing walls at plumbing penetrations. Also needs to fireblock at mech chase at ceiling. ok to insul.
BLD06-03538 BLD-Footing2/14/20072/14/20072/14/2007 2:41:06 PMPPART
rob ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-03537 BLD-Footing2/14/20072/14/20072/14/2007 2:40:49 PMPPART
rob ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-03405 BLD-Footing2/14/20072/14/20072/14/2007 2:40:23 PMPPASS
rob ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-00945 BLD-Foundation2/14/20072/14/20072/14/2007 2:39:47 PMPPASS
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD06-00918 BLD-Footing2/14/20072/14/20072/14/2007 1:59:45 PMPPASS
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD06-00920 BLD-Footing2/14/20072/14/20072/14/2007 1:38:39 PMPNR
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD06-00946 BLD-Foundation2/14/20072/14/20072/14/2007 1:38:17 PMPPART
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD06-03355 BLD-Framing/Rough-in2/13/20072/14/20072/14/2007 10:58:10 AMAPASS
Scheduled by a contractor via Hello! on 2/13/2007 at 10:18:39 AM. Contact: ###-####. ok to insul.
BLD06-03356 BLD-Framing/Rough-in2/13/20072/14/20072/14/2007 10:17:06 AMAPASS
Scheduled by a contractor via Hello! on 2/13/2007 at 10:20:26 AM. ok to insul.
BLD06-02843 BLD-Footing2/13/20072/14/20072/14/2007 9:42:46 AMAPART
Scheduled by a contractor via Hello! on 2/13/2007 at 11:42:37 AM. Contact: ###-####. Perimeter footing. Noted clearance issues and rebar not tied sufficiently. Special insp. to verify compliance. Contractor is having surveyor double check elev.
BLD06-02330 BLD-Final2/13/20072/14/20072/14/2007 9:07:25 AMAPASS
art or ###-####; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD06-02330 DOC - Permit Finaled2/14/20072/14/20072/14/2007 9:07:12 AMPPASS