ESC08-00086
| Site Preparation | 2/14/2008 | 2/14/2008 | 2/14/2008 4:47:02 PM | P | PASS |
|
|
Site has perimeter bmps in place. Plan has been ammended for wattles instead of silt fence. Stabilizedconstruction entrance has been properly installed. Sigh has been posted at Temp power pole at the left side of project and not at entrance due to evoding vandlism or theft os sign. I have approved this location. Site has passed inspection. "Stop Work Order" has been pulled. Work can commence as of 2/15/08 CAS #460
|
ESC06-01299
| Random Inspection | 2/14/2008 | 2/14/2008 | 2/14/2008 3:42:07 PM | P | PART |
|
|
Issued a Correction Notice for no stabilized entrance into staging area of project and no concrete washout area. Will re-inspect on 2/19/08 pm. CAS #460
|
ESC08-00024
| Site Preparation | 2/14/2008 | 2/14/2008 | 2/14/2008 2:30:52 PM | P | FAIL |
|
|
Needs to be stabilized wih some type of ground covering.
|
ESC07-00819
| Random Inspection | 2/13/2008 | 2/14/2008 | 2/14/2008 10:04:33 AM | A | PART |
|
|
Extending silt fence at the north west side of project. Also they will be addressing the berm of dirt at the back of project with hyro-seeding.
|
ESC07-00904
| Random Inspection | 2/14/2008 | 2/14/2008 | 2/14/2008 10:02:09 AM | P | CANC |
|
|
Discuss w/ Russ Rogers over stabilized construction parking
|