BLD10-00585
| FIRE-Final Inspection | 2/14/2011 | 2/14/2011 | 2/16/2011 3:08:57 PM | P | PART |
|
|
Pending project related FIR10-00644
|
BLD10-02371
| FIRE-Final Inspection | 2/14/2011 | 2/14/2011 | 2/16/2011 3:07:53 PM | P | PASS |
|
|
|
FIR10-00653
| INSP-Final Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 3:06:57 PM | P | PASS |
|
|
Scope of quick permit work approved for final status.
|
BLD10-01853
| FIRE-Sprinkler Rough-in | 2/14/2011 | 2/14/2011 | 2/14/2011 3:00:44 PM | P | PART |
|
|
Inspection for beam clamps/retainers and seismic brace attatchments at the 3rd floor okayed pre fireproof coating application.
|
FIR10-00501
| INSP-Conference | 2/14/2011 | 2/14/2011 | 2/14/2011 12:47:32 PM | P | DONE |
|
|
Regarding schedule for after hours acceptance testing.
|
FIR10-00531
| FIR-Aging Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 12:37:04 PM | | PEND |
|
|
Pending site inspection request when work is completed.
|
FIR10-00467
| FIR-Aging Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 12:35:42 PM | | DONE |
|
|
In progress
|
FIR05-00128
| INSP-Final Inspection | 2/11/2011 | 2/14/2011 | 2/14/2011 12:35:03 PM | A | PASS |
|
|
Permit finaled.
|
FIR10-00355
| INSP-Final Inspection | 2/9/2011 | 2/14/2011 | 2/14/2011 12:34:21 PM | A | PART |
|
|
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
|
FIR10-00653
| INSP-Final Inspection | 2/11/2011 | 2/14/2011 | 2/14/2011 12:32:33 PM | A | PART |
|
|
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
|
FIR10-00415
| INSP-Final Inspection | 2/9/2011 | 2/14/2011 | 2/14/2011 12:28:11 PM | A | FAIL |
|
|
C/N items include; pressure switch at the dry system must report as an alarm condition and initiate activation of the outside bell, adjust cd settings at the first floor vestibule and adjacent to the reception desk per plan, provide notification at the employee work room per plan review red line notes, mechanical room duct detector activates general alarm condition, provide a WP notification appliance at the 2nd floor shower room, replace 15cd strobe only per plan at the 2nd floor west corridor. KH monitor tested okay, remainder of fire sprinkler riser points also okayed.
|
BLD10-00842
| FIRE-Final Inspection | 2/11/2011 | 2/14/2011 | 2/14/2011 12:15:23 PM | A | NR |
|
|
Building fire life safety approval pending project related FIR permit finals and items noted on pre- inspection walkthrough including directional indicators at four exit signs 2nd floor, install ceiling tile at the southwest exit stairway, provide current certification for the type one kitchen hood suppression system, chevron at the 1st floor SE stairway exit sign. Resubmital for changes at the first floor door hardware schedule okayed.
|
FIR10-00415
| INSP-Sprinkler Rough-in/Hydro | 2/9/2011 | 2/14/2011 | 2/9/2011 8:23:35 AM | A | CANC |
|
|
Please schedule for 7:30am. Rafe with Protex is the contact his cell no. is ###-####. Thank you.
Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|