Inspections for the day of: Monday, February 14, 2011.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00585 FIRE-Final Inspection2/14/20112/14/20112/16/2011 3:08:57 PMPPART
Pending project related FIR10-00644
BLD10-02371 FIRE-Final Inspection2/14/20112/14/20112/16/2011 3:07:53 PMPPASS
FIR10-00653 INSP-Final Inspection2/14/20112/14/20112/14/2011 3:06:57 PMPPASS
Scope of quick permit work approved for final status.
BLD10-01853 FIRE-Sprinkler Rough-in2/14/20112/14/20112/14/2011 3:00:44 PMPPART
Inspection for beam clamps/retainers and seismic brace attatchments at the 3rd floor okayed pre fireproof coating application.
FIR10-00501 INSP-Conference2/14/20112/14/20112/14/2011 12:47:32 PMPDONE
Regarding schedule for after hours acceptance testing.
FIR10-00531 FIR-Aging Inspection2/14/20112/14/20112/14/2011 12:37:04 PM PEND
Pending site inspection request when work is completed.
FIR10-00467 FIR-Aging Inspection2/14/20112/14/20112/14/2011 12:35:42 PM DONE
In progress
FIR05-00128 INSP-Final Inspection2/11/20112/14/20112/14/2011 12:35:03 PMAPASS
Permit finaled.
FIR10-00355 INSP-Final Inspection2/9/20112/14/20112/14/2011 12:34:21 PMAPART
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
FIR10-00653 INSP-Final Inspection2/11/20112/14/20112/14/2011 12:32:33 PMAPART
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
FIR10-00415 INSP-Final Inspection2/9/20112/14/20112/14/2011 12:28:11 PMAFAIL
C/N items include; pressure switch at the dry system must report as an alarm condition and initiate activation of the outside bell, adjust cd settings at the first floor vestibule and adjacent to the reception desk per plan, provide notification at the employee work room per plan review red line notes, mechanical room duct detector activates general alarm condition, provide a WP notification appliance at the 2nd floor shower room, replace 15cd strobe only per plan at the 2nd floor west corridor. KH monitor tested okay, remainder of fire sprinkler riser points also okayed.
BLD10-00842 FIRE-Final Inspection2/11/20112/14/20112/14/2011 12:15:23 PMANR
Building fire life safety approval pending project related FIR permit finals and items noted on pre- inspection walkthrough including directional indicators at four exit signs 2nd floor, install ceiling tile at the southwest exit stairway, provide current certification for the type one kitchen hood suppression system, chevron at the 1st floor SE stairway exit sign. Resubmital for changes at the first floor door hardware schedule okayed.
FIR10-00415 INSP-Sprinkler Rough-in/Hydro2/9/20112/14/20112/9/2011 8:23:35 AMACANC
Please schedule for 7:30am. Rafe with Protex is the contact his cell no. is ###-####. Thank you.
Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates