BLD11-02801
| FIRE-Final Inspection | 2/14/2012 | 2/14/2012 | 2/16/2012 3:34:12 PM | A | NR |
|
|
|
FIR11-00642
| INSP-Final Inspection | 2/14/2012 | 2/14/2012 | 2/16/2012 8:33:08 AM | P | PART |
|
|
Completed notification testing and EOL voltage measurements for new nac's at the remodel area. Noted one non-functional strobe at the SRO office, remainder of test passed.
|
BLD12-00108
| FIRE-Final Inspection | 2/14/2012 | 2/14/2012 | 2/14/2012 3:46:18 PM | P | PASS |
|
|
Previous C/N items completed. Occupant load amended per plan review. Fire life safety finaled.
|
BLD11-02919
| BLD-Final | 2/14/2012 | 2/14/2012 | 2/14/2012 3:43:45 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD11-00123
| FIRE-Final Inspection | 2/8/2012 | 2/14/2012 | 2/14/2012 3:42:41 PM | A | FAIL |
|
|
Noted corrections include; two existing EM lights need repair, provide "door to remain unlocked while building is occupied" signage at the main entry/exit, missing exit signs/EM lights and floor hatching per approved plan sheet E1 and F1 at the parts area B, need lever hardware at the new office door per plan schedule. See fire code review note items 6,7,and 8 for details.
|
BLD11-00289
| FIRE-Final Inspection | 2/8/2012 | 2/14/2012 | 2/14/2012 3:36:58 PM | A | PASS |
|
|
Rack permit inspection passed.
|
BLD11-01151
| FIRE-Final Inspection | 2/14/2012 | 2/14/2012 | 2/14/2012 3:35:00 PM | A | PASS |
|
|
|
FIR12-00051
| INSP-Alarm Testing | 2/14/2012 | 2/14/2012 | 2/14/2012 3:34:22 PM | A | PART |
|
|
Regarding manual pull.
|