ESC08-00407
| BMP Violation | 2/14/2012 | 2/14/2012 | 2/14/2012 4:56:51 PM | P | PART |
|
|
Verbal correction notice to RP(left message on cell phone) to clean all silts from hard surfaces and trackout onto emerald. Aslo noted to RP that he needs to be providing additional BMP measures to keep trackout to minimum.
|
MIS12-00015
| BLD-Final | 2/14/2012 | 2/14/2012 | 2/14/2012 2:24:57 PM | P | PASS |
|
|
Please contact Becki at the number provided or at ###-#### for access. I have been told all repairs have been completed. Thank you! Phone #: ###-#### >> Inspection requested via web by Connie LaFrainer. All issues have been resolved.
|
BLD11-02578
| BLD-Final | 2/14/2012 | 2/14/2012 | 2/14/2012 2:16:50 PM | P | PASS |
|
|
need final inspection pass for occupancy, electrical signed off now. ok for perm occ.
|
BLD10-02069
| BLD-Conference | 2/14/2012 | 2/14/2012 | 2/14/2012 11:37:42 AM | A | CANC |
|
|
Site sewer inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer
|
BLD11-02578
| BLD-Final | 2/13/2012 | 2/14/2012 | 2/14/2012 10:50:09 AM | A | PART |
|
|
tim Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once electrical signs off perm.
|
GCB12-00008
| GCB-Framing | 2/13/2012 | 2/14/2012 | 2/14/2012 9:39:51 AM | A | PASS |
|
|
Requested a Nailing inspection.call for access ###-####. NAiling at 1hr. wall ok.
|
GCB11-00103
| GCB-Energy | 2/13/2012 | 2/14/2012 | 2/14/2012 9:22:59 AM | A | PASS |
|
|
Eric ###-####Requested AM Inspection. As early as possible.
|
GCB11-00103
| GCB-Framing | 2/13/2012 | 2/14/2012 | 2/14/2012 9:22:43 AM | A | PASS |
|
|
Eric ###-####Requested AM inspection. As early as possible.
|