BLD13-00108
| BLD-Footing | 2/13/2013 | 2/14/2013 | 2/14/2013 7:09:50 PM | P | PASS |
|
|
dane Phone #: ###-####
|
BLD13-00071
| BLD-Footing | 2/13/2013 | 2/14/2013 | 2/14/2013 7:06:56 PM | P | CANC |
|
|
dane Phone #: ###-####
|
BLD13-00199
| BLD-Final | 2/13/2013 | 2/14/2013 | 2/14/2013 7:05:34 PM | A | PART |
|
|
Sergio Phone #: ###-#### Should have been Framing insp. Frame Pass.
|
BLD12-01950
| BLD-Other | 2/14/2013 | 2/14/2013 | 2/14/2013 4:52:59 PM | P | PART |
|
|
Columns - Devin Phone #: ###-#### Inspection of CMU installation above new steel columns and beams. Beam bolting connection to New CMU wall. Bolting attachment of ledger for roof support to CMU wall. OK Pending MTI inspection, report and approval.
|
GCB12-00154
| GCB-Footing | 2/14/2013 | 2/14/2013 | 2/14/2013 4:43:53 PM | P | CANC |
|
|
Heron @ ###-#### Contr. Cancelled.
|
GCB12-00153
| GCB-Footing | 2/14/2013 | 2/14/2013 | 2/14/2013 4:41:45 PM | P | CANC |
|
|
Heron @ ###-#### Contr.cancelled.
|
BLD12-02265
| BLD-Framing/Rough-in | 2/13/2013 | 2/14/2013 | 2/14/2013 4:40:49 PM | P | PASS |
|
|
TRAVIS Phone #: ###-####
|
BLD10-02680
| BLD-Final | 2/14/2013 | 2/14/2013 | 2/14/2013 10:45:20 AM | A | CANC |
|
|
|
GCB12-00168
| GCB-Energy | 2/14/2013 | 2/14/2013 | 2/14/2013 10:44:16 AM | A | PASS |
|
|
Joe @ ###-####
|
GCB12-00168
| GCB-Framing | 2/14/2013 | 2/14/2013 | 2/14/2013 10:43:30 AM | A | PASS |
|
|
Joe @ ###-####
|