FIR14-00087
| INSP-Sprinkler Rough-in | 2/14/2014 | 2/14/2014 | 2/14/2014 3:42:16 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR14-00026
| INSP-Final Inspection | 2/14/2014 | 2/14/2014 | 2/14/2014 3:37:53 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00099
| FIR-Aging Inspection | 2/14/2014 | 2/14/2014 | 2/14/2014 2:53:42 PM | | PASS |
|
|
|
FIR13-00099
| INSP-Final Inspection | 2/14/2014 | 2/14/2014 | 2/14/2014 2:53:19 PM | P | PASS |
|
|
Permit finaled
|
BLD13-02408
| FIRE-Conference | 2/14/2014 | 2/14/2014 | 2/14/2014 2:01:29 PM | P | DONE |
|
|
I went over life safety requirements with the owner. The keyed deadbolt will need to removed from the door to the Brewing room. I let her know that single action will be required. Also the manual flush bolts in the in-active leaf of the main exit will need to be removed unless she can meet the exception or automatic flush bolts installed. She had no "small documents" either.
|
BLD14-00221
| FIRE-Final Inspection | 2/13/2014 | 2/14/2014 | 2/14/2014 1:56:29 PM | A | PASS |
|
|
Life safety passed
|
FIR14-00026
| INSP-Sprinkler Rough-in | 2/13/2014 | 2/14/2014 | 2/14/2014 11:03:21 AM | A | PASS |
|
|
Plans are on site with Ben the Superintendant Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
FIR13-00692
| INSP-Final Inspection | 2/13/2014 | 2/14/2014 | 2/14/2014 11:03:00 AM | A | PASS |
|
|
Permit finaled
|