Inspections for the day of: Tuesday, February 14, 2017.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-00307 Electrical Rough-In2/14/20172/14/20172/14/2017 1:13:23 PMPPASS
Phone #: ###-#### Inspection requested via web by Don Conley RI ok cover
ELE16-03326 Final2/13/20172/14/20172/14/2017 12:58:07 PMPNR
Bobby Phone #: ###-#### Talked to homeowner. Will schedule for tomorrow. 2/15/17
ELE17-00355 Permanent Service2/14/20172/14/20172/14/2017 12:30:18 PMPPASS
Mike Phone #: ###-#### p/s u/g rec ok
ELE17-00147 Final2/13/20172/14/20172/14/2017 12:09:43 PMPNH
Please call Luke if you have any questions. Thank you! Phone #: ###-#### Inspection requested via web by Clay Morgan Knocked on door and rang door bell. Talked to Luke, he is going to try to coordinate time with homeowner or builder
ELE17-00362 Electrical Rough-In2/14/20172/14/20172/14/2017 11:46:02 AMPPASS
cover for bathroom walls Phone #: ###-#### Inspection requested via web by dennis mcneely ok cover
ELE17-00359 Electrical Rough-In2/14/20172/14/20172/14/2017 11:19:41 AMPPASS
We Rough In Some Cans In A Zero Clearance Roof We Will Be Supplementing This Permit For A total Rewire Of This House Once We Have All The Information. They Need To Insulate And Cover The Roof Due To Weather Wires Are Ran And Stubbed Down To Tentative Switch Locations.Thanks Dave ###-#### Phone #: ###-#### Inspection requested via web by jason shifflett Ok cover 5 shallow cutin cans in main living space
ELE17-00361 Permanent Service2/14/20172/14/20172/14/2017 11:19:40 AMPPASS
Mike-please call 1 hour prior for access Phone #: ###-####0 Talked to Mike, panel change is the only thing he is doing. Another electrical contractor is doing the remodel
ELE17-00271 Electrical Rough-In2/13/20172/14/20172/14/2017 9:09:15 AMAPASS
Rocky Phone #: ###-#### Cover ok on existing wall in garage for newly fed panel.
ELE16-03051 Electrical Rough-In2/13/20172/14/20172/14/2017 9:08:11 AMAPASS
Swimming pool bonding Phone #: ###-#### Inspection requested via web by Lars Johnson All pockets for handrails and grabrails on pool and spa in place. EQ plane for pool and spa are tied together as one.
ELE13-01504 ELE-Aging Inspection2/14/20172/14/20172/14/2017 7:24:30 AM DONE
Inspector talked to contractor on 8/18/16 about scheduling a final. No inspection requested at this time.
ELE13-01501 ELE-Aging Inspection2/14/20172/14/20172/14/2017 7:22:52 AM DONE
Inspector talked to contractor on 6/30/16 about final inspection. No inspection requested at this time