Inspections for the day of: Tuesday, February 14, 2017.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00810 INSP-Sprinkler Rough-in2/14/20172/14/20172/14/2017 12:00:57 PMPPART
The underground piping on the exterior of the building is ok for cover. The thrust block at the base of the IBR has not been installed yet and will require another inspection prior to cover.
FIR17-00050 INSP-Sprinkler Rough-in2/14/20172/14/20172/14/2017 11:14:18 AMPCANC
Please call Troy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR16-00813 INSP-Final Inspection2/13/20172/14/20172/14/2017 11:13:42 AMPPASS
Permit finaled
BLD16-00856 FIRE-Final Inspection2/14/20172/14/20172/14/2017 11:13:15 AMPPASS
Life safety passed. Victor agreed to have the sticker at the main exit, keyed both sides on dead bolt and lever single action hardware prior to the building inspection.
BLD16-03951 FIRE-Conference2/13/20172/14/20172/14/2017 9:45:00 AMADONE
John and I discussed the placement of the exit signs due to the full height wall now being only 5' high. I deferred him also to the building inspector for secondary approval.
FIR17-00050 INSP-Sprinkler Rough-in2/13/20172/14/20172/14/2017 8:28:32 AMAPASS
Rough-in passed. Piping can be covered.
BLD17-00200 FIRE-Final Inspection2/13/20172/14/20172/14/2017 7:37:16 AMAPASS
Life safety passed. Smoke evac system functioned correctly