ELE08-00888
| Final | 2/5/2018 | 2/14/2018 | 2/14/2018 2:54:34 PM | P | PASS |
|
|
Please call ahead for access, inspection close a previoulsy expired permit - David Phone #: ###-####...corrections made...ok to final
|
ELE18-00390
| Electrical Rough-In | 2/14/2018 | 2/14/2018 | 2/14/2018 2:26:02 PM | P | PASS |
|
|
Please call James Linglebach 20 minutes prior to arrival to gain access to tenant space. Call Ben MacDonagh @ ###-#### if there is no answer from James L. Phone #: ###-#### Inspection requested via web by Scott Campbell...walls ok to cover and hardlid in new back bathroom
|
ELE18-00586
| Electrical Rough-In | 2/13/2018 | 2/14/2018 | 2/14/2018 1:56:21 PM | P | PASS |
|
|
Upstairs master bath remodel. Relocated light fixtures for new walk in shower and vainity. Phone #: ###-#### Inspection requested via web by Heath Thomas...rough ok to cover
|
ELE18-00163
| Final | 2/14/2018 | 2/14/2018 | 2/14/2018 1:19:41 PM | P | PASS |
|
|
Cell Site Final inspection Contact Steve Hess Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek...ok to final correction made
|
ELE17-04011
| Final | 2/13/2018 | 2/14/2018 | 2/14/2018 1:03:28 PM | P | FAIL |
|
|
code 2.3.4 Phone #: ###-#### Inspection requested via web by Neal Rumsey...outlet needs installed to the right of sink in kitchen
|
ELE17-04214
| Final | 2/13/2018 | 2/14/2018 | 2/14/2018 12:17:01 PM | P | PASS |
|
|
Please perform final inspection. Call Danny with any questions. Phone #: ###-#### Inspection requested via web by Kevin Perez...equipment UL listed...job complete...ok to final
|
ELE18-00530
| Rough-In Permanent Service | 2/13/2018 | 2/14/2018 | 2/14/2018 11:40:13 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...rough ok to cover...p/s u/g new ok 5 meters
|
ELE18-00564
| Conference | 2/13/2018 | 2/14/2018 | 2/14/2018 11:03:59 AM | A | PASS |
|
|
Please call in advance to meet on site. Phone #: ###-#### Inspection requested via web by Scott Campbell...discussed location, feeds, disconnect, grounding, metering, and temporary power
|
ELE18-00576
| Final | 2/13/2018 | 2/14/2018 | 2/14/2018 10:15:49 AM | A | PASS |
|
|
4 pole lights and 4 outside building lights retrofitted to LEDS from 400 watt MH. Led box with UL listing at front desk. Phone #: ###-#### Inspection requested via web by David McClellan..ballast bypased and LED lamp...UL verified...job complete..ok to final
|
ELE17-02649
| Electrical Rough-In | 2/13/2018 | 2/14/2018 | 2/14/2018 10:03:25 AM | A | PASS |
|
|
Ceiling inspection, contact is Andy Chambers Phone #: ###-#### Inspection requested via web by Scott Campbell...ceiling grid marked and dated
|
ELE18-00358
| Rough-In Permanent Service | 2/13/2018 | 2/14/2018 | 2/14/2018 9:25:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Murray...rough ok to cover...p/s u/g new ok
|
ELE18-00577
| Electrical Rough-In | 2/13/2018 | 2/14/2018 | 2/14/2018 8:44:01 AM | A | PASS |
|
|
Wall inspection. Phone #: ###-#### Inspection requested via web by Dean Gernaat...walls ok to cover
|
ELE17-02577
| Final | 2/13/2018 | 2/14/2018 | 2/13/2018 1:28:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender...ok to final
|