Inspections for the day of: Friday, February 14, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03210 FIRE-Final Inspection2/14/20202/14/20202/14/2020 2:45:12 PMPFAIL
The engineer's details for the notification height state the device is to be mounted between 80" and 96". All of the devices have been mounted above the stated limits.


Life safety Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD19-03703 FIRE-Final Inspection2/14/20202/14/20202/14/2020 1:50:54 PMPPASS
Life safety passed.

Brandon Phone #: ###-####
FIR19-00965 INSP-Final Inspection2/13/20202/14/20202/14/2020 1:03:32 PMPFAIL
Tested the two smoke detectors as shown on the plans but an additional detector is needed on the other side of the beam that splits the room in two.Provide as-builts prior to the next inspection.

Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
BLD19-01927 FIRE-Final Inspection2/13/20202/14/20202/14/2020 12:39:24 PMPFAIL
Provide all of the small documents, provide letter from the architect for compliance with the 2018 IFC 1010.1.9.11 exception #3, repair the exit sign in the 4th floor conference room.

Phone #: ###-#### Inspection requested via web by Sam Reading
FIR20-00006 INSP-Sprinkler Rough-in2/14/20202/14/20202/14/2020 11:52:47 AMPCANC
Contact Ken Orahood ###-#### 30 min prior to RTC Insp Start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
FIR19-00702 INSP-Sprinkler Rough-in2/14/20202/14/20202/14/2020 10:19:28 AMPPASS
Fourth floor piping is ok for cover. See Mark Stumbaugh letter. Fourth floor rough to cover, ready any time. Call James when heading out there so he can meet you. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00816 INSP-Sprinkler Rough-in2/13/20202/14/20202/14/2020 10:18:18 AMAPASS
Rough/Tenting on Tower 1 ; 2, is passed. Piping can be covered.

call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00852 INSP-Final Inspection2/14/20202/14/20202/14/2020 10:04:22 AMPPASS
Permit finaled.

Inspection requested via web by Fire Scheduler
FIR20-00085 INSP-Sprinkler Rough-in2/13/20202/14/20202/14/2020 9:55:26 AMAPASS
Overhead rough passed, vertical pipe installed. Piping can be covered.

Call Anthony with any questions or concerns. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00100 INSP-Final Inspection2/13/20202/14/20202/14/2020 9:24:21 AMACANC
Payton Phone #: ###-####
FIR20-00100 INSP-Sprinkler Rough-in2/13/20202/14/20202/14/2020 9:24:06 AMAPASS
Rough-in passed. Piping can be covered.

Payton Phone #: ###-####