FIR99-00599
| INSP-Sprinkler Rough-in/Hydro | 2/14/2000 | 2/15/2000 | 2/15/2000 12:00:00 AM | A | PART |
|
|
###-#### Ok on above ground hydro test and sprinkler R/I. 2/16/00 9:41:19 AM
|
BLD99-03518
| FIRE-Final Inspection | 2/14/2000 | 2/15/2000 | 2/15/2000 12:00:00 AM | A | PASS |
|
|
###-#### Final ok for certificate of completion. 2/16/00 9:29:26 AM
|
FIR00-00067
| INSP-Sprinkler Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Spklr R/I fail complete piping, install tenting over spacing. 2/16/00 9:30:17 AM
|
FIR00-00066
| INSP-Sprinkler Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 12:00:00 AM | A | FAIL |
|
|
Spklr. R/I fail complete piping, install tenting, overspacing. 2/16/00 9:31:06 AM
|
FIR00-00069
| INSP-Sprinkler Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 12:00:00 AM | A | FAIL |
|
|
Spklr R/I fail complete piping,install tenting, overspacing. 2/16/00 9:29:13 AM
|
BLD99-03253
| FIRE-Final Inspection | 2/14/2000 | 2/15/2000 | 2/15/2000 12:00:00 AM | A | FAIL |
|
|
###-#### call for appointment Final fail C/N issued spklr coverage, fire ext, exit doors. 2/16/00 9:40:54 AM
|