Inspections for the day of: Thursday, February 15, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-00295 Final2/14/20012/15/20012/15/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/14/2001 at 08:59:39. Contact: ###-####. some fixtures not installed; basement. 2/15/2001 9:07:53 AM
ELE00-03777 Electrical Rough-In2/14/20012/15/20012/15/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/14/2001 at 10:24:13. Contact: ###-####. ceiling ele r/i, ok. 2/15/2001 10:36:23 AM
ELE00-04913 Final2/14/20012/15/20012/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/14/2001 at 12:31:14. Contact: ###-####. completed. 2/15/2001 10:03:27 AM
ELE00-04800 Final2/14/20012/15/20012/15/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/14/2001 at 15:02:24. Contact: ###-####.temporay occupancy, needs panel blanks, skirting @ bottom of panel, & floor box. 2/15/2001 11:53:32 AM
ELE00-04753 Electrical Rough-In2/15/20012/15/20012/15/2001 12:00:00 AMPPASS
Terry Miller ###-####. additional meter/main
service panel at garage. ok

p/s oh n horizon ele #4753
londoner first Lot: 0 Block: 39 2/15/2001 4:22:11 PM
ELE01-00486 Temporary Service2/15/20012/15/20012/15/2001 12:00:00 AMPPASS
temp pole ###-####. service for construction trailer. ok

t/s ug romar ele #0486
riverside add to boise Lot: 10 Block: 4 2/15/2001 2:49:07 PM
ELE01-00295 Final2/15/20012/15/20012/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/15/2001 at 10:56:37. Contact: ###-####. completed. ok 2/15/2001 2:04:52 PM
ELE01-00485 Electrical Rough-In2/15/20012/15/20012/15/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/15/2001 at 11:16:03. Contact: ###-####.. equiptment room ele r/i; ok. 2/15/2001 3:08:37 PM