BLD99-03148
| FIRE-Alarm Testing | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 409 On 2/14/2001 1:49:04 PM 8:30 need lables for room detectors; stair tower debris and exit door blocked by dumpster; sprinkler head in electrical closet on 5th floor 2/15/2001 9:25:11 AM
|
FIR00-00604
| INSP-Sprinkler Rough-in/Hydro | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 409 On 2/15/2001 10:13:34 AM pressure test of room to ensure the FM 200 agent will maintain required levels after activation. passed test. Drake and Bruce with CM company present to witness test.
|
BLD99-03148
| FIRE-Final Inspection | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 409 On 2/15/2001 2:47:58 PM 5th floor complete
|
BLD00-03716
| FIRE-Final Inspection | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 2/15/2001 4:07:17 PM
|
BLD99-02185
| FIRE-Final Inspection | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 2/15/2001 4:07:49 PM
|