Inspections for the day of: Thursday, February 15, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03615 BLD-Framing/Rough-in2/14/20012/15/20012/15/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/14/2001 at 13:04:43. Contact: ###-####.
verify air space in attic areas, straps on corner top plates 2/15/2001 9:45:49 AM
MEC01-00425 Pressure Test2/14/20012/15/20012/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/14/2001 at 14:28:49. Contact: ###-####.
rouph in ok 2/15/2001 9:40:08 AM
BLD00-01487 BLD-Framing/Rough-in2/14/20012/15/20012/15/2001 12:00:00 AMAPART
###-####
see bld00-01488 notes 2/15/2001 12:03:09 PM
BLD00-01488 BLD-Framing/Rough-in2/14/20012/15/20012/15/2001 12:00:00 AMAPART
need to see 1 hr assembly on main floor b4 insulation, ok to insulate upper, verify previous and paint marks 2/15/2001 12:02:22 PM
BLD00-01478 BLD-Footing2/14/20012/15/20012/15/2001 12:00:00 AMAPART
###-####
int. ftg. wip 2/15/2001 11:36:20 AM
BLD00-01497 BLD-Framing/Rough-in2/14/20012/15/20012/15/2001 12:00:00 AMAPART
Scheduled by Inspector: 415 On 2/14/2001 4:06:41 PM
ext. shear ok 2/15/2001 12:03:34 PM
MEC01-00241 Rough-in2/14/20012/15/20012/15/2001 12:00:00 AMACANC
###-####
BLD00-00288 BLD-Final2/14/20012/15/20012/15/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/14/2001 at 16:21:57. Contact: ###-####.
c/n posted,,,ok for occupancy in main level only, basement later after finish all the way, reroof, etc. 2/15/2001 3:35:14 PM
BLD00-03397 BLD-Energy code compliance2/15/20012/15/20012/15/2001 12:00:00 AMPPASS
DON ###-#### ENERGY CODE
BLD00-03185 BLD-Footing2/15/20012/15/20012/15/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/15/2001 at 09:04:46. Contact: ###-####.
met w/ kent, new job super, wip ok pending special insp. report, also t/w s. inspector 2/15/2001 3:50:18 PM
BLD00-02088 BLD-Framing/Rough-in2/15/20012/15/20012/15/2001 12:00:00 AMPPART
basement ###-#### please call before going out
conf. on framing etc.,,, need trade sign offs b4 pass,,,nice guy,, w/ j105 2/15/2001 2:03:52 PM
MEC01-00457 Rough-in2/15/20012/15/20012/15/2001 12:00:00 AMPFAIL
f/p only Rhonda ###-####
needs framing around 1st and b vent hooked up 2/15/2001 4:03:14 PM
BLD00-03400 BLD-Framing/Rough-in2/15/20012/15/20012/15/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/15/2001 at 10:25:24. Contact: ###-####.
ext. shear ok 2/16/2001 8:01:29 AM
BLD01-00201 BLD-Footing2/14/20012/15/20012/15/2001 12:00:00 AMPPASS
###-####