BLD00-03684
| BLD-Framing/Rough-in | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | CANC |
|
|
###-####: cancelled by contractor 2/15/2001 9:07:56 AM
|
BLD00-03326
| BLD-Final | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 13:40:00. Contact: ###-####. C. of C. #20116 issued 2/15/2001 12:16:18 PM
|
BLD00-02782
| BLD-Final | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 13:41:15. Contact: ###-####. C. of C. #20114 issued. 2/15/2001 12:17:09 PM
|
BLD00-03673
| BLD-Energy code compliance | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-00349
| Rough-in | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 15:46:49. Contact: ###-####.
|
BLD01-00175
| BLD-Foundation | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 05:23:51. Contact: ###-####.hd not in place at time of inspection. 2/15/2001 9:12:32 AM
|
MEC01-00411
| Rough-in | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 08:26:11. Contact: ###-####.c/n issued 2/15/2001 1:50:00 PM
|
BLD00-03565
| BLD-Framing/Rough-in | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PASS |
|
|
reinspection Kent ###-####
|
BLD00-03601
| BLD-Framing/Rough-in | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PART |
|
|
reinspection Matt ###-####c/n issued--eng. needed on 2 ply ml with hole penetration, gable trusses of m. bed and b.r. # 2 needs stiffbacks or standard gable truss detail indicating not needed, solid bearing under m.l in closet off formal gathering room, marked with black x. 2/15/2001 1:03:01 PM
|
BLD00-03698
| BLD-Framing/Rough-in | 2/15/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 10:49:30. Contact: ###-####. c/n--blocking at entry on bearing wall, Plan list 4X10 headers but throughout are 4X8, provide documentation. 2/15/2001 3:26:19 PM
|
BLD00-03493
| BLD-Framing/Rough-in | 2/14/2001 | 2/15/2001 | 2/15/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 17:04:22. Contact: ###-####. c/n issued--draftstop needed at ends of archways. 2/15/2001 2:35:44 PM
|